Evaluating the role of critical success factors of Total quality management (TQM) implementation through SmartPLS in industrialized building projects (IBS)

This study develops a model for Total Quality Management (TQM) in Malaysian Industrialized Building System (IBS) projects, examining the impact of critical success factors (CSFs) on TQM application. Within the scope of a survey carried out among construction experts, 371 valid answers were processed...

全面介绍

书目详细资料
发表在:AIN SHAMS ENGINEERING JOURNAL
Main Authors: Alawag, Aawag Mohsen; Alaloul, Wesam Salah; Mohamad, Hisham; Liew, M. S.; Awang, Mokhtar; Baarimah, Abdullah O.
格式: 文件
语言:English
出版: ELSEVIER 2025
主题:
在线阅读:https://www-webofscience-com.uitm.idm.oclc.org/wos/woscc/full-record/WOS:001425617000001
实物特征
总结:This study develops a model for Total Quality Management (TQM) in Malaysian Industrialized Building System (IBS) projects, examining the impact of critical success factors (CSFs) on TQM application. Within the scope of a survey carried out among construction experts, 371 valid answers were processed, which is regarded as adequate for performing Structural Equation Modeling (SEM) analysis. Through a survey among construction experts in Malaysia and subsequent PLS-SEM analysis, six CSFs were identified as significantly influencing TQM implementation in IBS projects. These factors underscore the importance of strategic focus on key areas to enhance TQM practices within the construction industry. Collectively, these CSFs account for 70.7 % of the effectiveness in implementing TQM, indicating their substantial role in the success of TQM strategies. The outcomes of this research have significant implications for the decision-making process in the construction field, particularly in the context of Malaysian Industrialized Building System (IBS) projects.
ISSN:2090-4479
2090-4495
DOI:10.1016/j.asej.2025.103294