Investigation of generic house components and their practical ways to be assessed by house buyers during defect liability period in Malaysia

The newly built residential house basically had undergone a period where any defects toward the house will be rectified by the particular developer. Defect Liability Period (DLP) which is commenced from the day of Vacant Possession (VP) by house owners generally in effect between eighteen (18) month...

全面介紹

書目詳細資料
發表在:International Journal of Engineering, Transactions A: Basics
主要作者: 2-s2.0-85015212123
格式: Article
語言:English
出版: Materials and Energy Research Center 2016
在線閱讀:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85015212123&doi=10.5829%2fidosi.ije.2016.29.10a.05&partnerID=40&md5=e8fbf1f2d206f9480eafbf102610fb86