Investigation of generic house components and their practical ways to be assessed by house buyers during defect liability period in Malaysia
The newly built residential house basically had undergone a period where any defects toward the house will be rectified by the particular developer. Defect Liability Period (DLP) which is commenced from the day of Vacant Possession (VP) by house owners generally in effect between eighteen (18) month...
الحاوية / القاعدة: | International Journal of Engineering, Transactions A: Basics |
---|---|
المؤلف الرئيسي: | |
التنسيق: | مقال |
اللغة: | English |
منشور في: |
Materials and Energy Research Center
2016
|
الوصول للمادة أونلاين: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85015212123&doi=10.5829%2fidosi.ije.2016.29.10a.05&partnerID=40&md5=e8fbf1f2d206f9480eafbf102610fb86 |