A mixed integer programming model for solving real-time truck-to-door assignment and scheduling problem at cross docking warehouse
This paper address the problem at the inbound phase at the cross docking warehouse. The fundamental issues in cross docking facility is to assign the incoming truck to the door and to coordinate the sequences of the trucks in order to minimize the completion time at the inbound phase. Using the theo...
الحاوية / القاعدة: | Journal of Industrial and Management Optimization |
---|---|
المؤلف الرئيسي: | |
التنسيق: | مقال |
اللغة: | English |
منشور في: |
American Institute of Mathematical Sciences
2016
|
الوصول للمادة أونلاين: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84955284616&doi=10.3934%2fjimo.2016.12.431&partnerID=40&md5=84782cd0ebf366a053517d28967ef826 |