Ngadiron, Ganasan, Z., Ramli, R., Mahyeddin, M. F., Luqman, M. E., Jiafu, M. I., & Guo; Kamaluddin, N. A. (2024). Predictive Model for Incident Severity at Railway Construction Site Using Rapid Miner. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 15(4), . https://doi.org/10.30880/ijscet.2025.00.00.000
Chicago Style (17th ed.) CitationNgadiron, Zuraidah Ganasan, Reventheren Ramli, Mimi Faisyalini Mahyeddin, Mohd Eizzuddin Luqman, M. Izzad Jiafu, and N. A. Guo; Kamaluddin. "Predictive Model for Incident Severity at Railway Construction Site Using Rapid Miner." INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY 15, no. 4 (2024). https://doi.org/10.30880/ijscet.2025.00.00.000.
MLA (8th ed.) CitationNgadiron, et al. "Predictive Model for Incident Severity at Railway Construction Site Using Rapid Miner." INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, vol. 15, no. 4, 2024, https://doi.org/10.30880/ijscet.2025.00.00.000.