Assessing Building Information Modelling (BIM) Maturity Level in Design and Build Public Projects: Case Studies of Public Projects in Malaysia

Design and Build (D&B) is one of the most common project delivery methods to incorporate with Building Information Modelling (BIM) and has brought to light many innovative benefits, including collaboration and integration of work processes. However, there is still confusion and a lack of empiric...

Full description

Bibliographic Details
Published in:INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY
Main Authors: Yusoff, Seri Nanisa Sima; Brahim, Juliana; Nordin, Rumaizah Mohd; Preece, Christopher
Format: Article
Language:English
Published: UNIV TUN HUSSEIN ONN MALAYSIA 2023
Subjects:
Online Access:https://www-webofscience-com.uitm.idm.oclc.org/wos/woscc/full-record/WOS:001108645300001
author Yusoff
Seri Nanisa Sima; Brahim
Juliana; Nordin
Rumaizah Mohd; Preece
Christopher
spellingShingle Yusoff
Seri Nanisa Sima; Brahim
Juliana; Nordin
Rumaizah Mohd; Preece
Christopher
Assessing Building Information Modelling (BIM) Maturity Level in Design and Build Public Projects: Case Studies of Public Projects in Malaysia
Construction & Building Technology
author_facet Yusoff
Seri Nanisa Sima; Brahim
Juliana; Nordin
Rumaizah Mohd; Preece
Christopher
author_sort Yusoff
spelling Yusoff, Seri Nanisa Sima; Brahim, Juliana; Nordin, Rumaizah Mohd; Preece, Christopher
Assessing Building Information Modelling (BIM) Maturity Level in Design and Build Public Projects: Case Studies of Public Projects in Malaysia
INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY
English
Article
Design and Build (D&B) is one of the most common project delivery methods to incorporate with Building Information Modelling (BIM) and has brought to light many innovative benefits, including collaboration and integration of work processes. However, there is still confusion and a lack of empirical evidence in the construction industry regarding the interpretation of success in a BIM implementation, especially in D&B projects. Hence, this paper is aimed to assess the current maturity level of BIM in D&B BIM projects. A quantitative method by means of a survey via questionnaire has been used by adopting the Migration Path Model of BIM for Construction Professionals to 31 respondents in three (3) public D&B projects. The findings revealed that the implementation of BIM in those three (3) selected projects does not meet the requirement of BIM maturity in projects. Nevertheless, the BIM competencies of the projects gradually increase throughout the shift of project years. The low level of BIM maturity implies a need to have a standardised policy and guideline in determining the maturity and competencies of BIM implementation in projects at the national and market levels. Thus, it is expected that the results of this research will assist in ensuring the benefit of disruptive technology like BIM could be reaped by the construction industry.
UNIV TUN HUSSEIN ONN MALAYSIA
2180-3242

2023
14
5
10.30880/ijscet.2023.14.05.019
Construction & Building Technology
gold
WOS:001108645300001
https://www-webofscience-com.uitm.idm.oclc.org/wos/woscc/full-record/WOS:001108645300001
title Assessing Building Information Modelling (BIM) Maturity Level in Design and Build Public Projects: Case Studies of Public Projects in Malaysia
title_short Assessing Building Information Modelling (BIM) Maturity Level in Design and Build Public Projects: Case Studies of Public Projects in Malaysia
title_full Assessing Building Information Modelling (BIM) Maturity Level in Design and Build Public Projects: Case Studies of Public Projects in Malaysia
title_fullStr Assessing Building Information Modelling (BIM) Maturity Level in Design and Build Public Projects: Case Studies of Public Projects in Malaysia
title_full_unstemmed Assessing Building Information Modelling (BIM) Maturity Level in Design and Build Public Projects: Case Studies of Public Projects in Malaysia
title_sort Assessing Building Information Modelling (BIM) Maturity Level in Design and Build Public Projects: Case Studies of Public Projects in Malaysia
container_title INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY
language English
format Article
description Design and Build (D&B) is one of the most common project delivery methods to incorporate with Building Information Modelling (BIM) and has brought to light many innovative benefits, including collaboration and integration of work processes. However, there is still confusion and a lack of empirical evidence in the construction industry regarding the interpretation of success in a BIM implementation, especially in D&B projects. Hence, this paper is aimed to assess the current maturity level of BIM in D&B BIM projects. A quantitative method by means of a survey via questionnaire has been used by adopting the Migration Path Model of BIM for Construction Professionals to 31 respondents in three (3) public D&B projects. The findings revealed that the implementation of BIM in those three (3) selected projects does not meet the requirement of BIM maturity in projects. Nevertheless, the BIM competencies of the projects gradually increase throughout the shift of project years. The low level of BIM maturity implies a need to have a standardised policy and guideline in determining the maturity and competencies of BIM implementation in projects at the national and market levels. Thus, it is expected that the results of this research will assist in ensuring the benefit of disruptive technology like BIM could be reaped by the construction industry.
publisher UNIV TUN HUSSEIN ONN MALAYSIA
issn 2180-3242

publishDate 2023
container_volume 14
container_issue 5
doi_str_mv 10.30880/ijscet.2023.14.05.019
topic Construction & Building Technology
topic_facet Construction & Building Technology
accesstype gold
id WOS:001108645300001
url https://www-webofscience-com.uitm.idm.oclc.org/wos/woscc/full-record/WOS:001108645300001
record_format wos
collection Web of Science (WoS)
_version_ 1809678576995270656