2-s2.0-85215700611. (2024). Development of Costing Model for Butt Joint Process using Mild Steel with Robotic GMAW: A Malaysian Context. Journal of Mechanical Engineering, 13, . https://doi.org/10.24191/jmeche.v13i1.2927
Chicago Style (17th ed.) Citation2-s2.0-85215700611. "Development of Costing Model for Butt Joint Process Using Mild Steel with Robotic GMAW: A Malaysian Context." Journal of Mechanical Engineering 13 (2024). https://doi.org/10.24191/jmeche.v13i1.2927.
MLA引文2-s2.0-85215700611. "Development of Costing Model for Butt Joint Process Using Mild Steel with Robotic GMAW: A Malaysian Context." Journal of Mechanical Engineering, vol. 13, 2024, https://doi.org/10.24191/jmeche.v13i1.2927.
警告:這些引文格式不一定是100%准確.