Integrated sand management: modeling of sand erosion in a mature oil field in Malaysia

Sand production can lead to various problems, including erosion in production flow lines that may lead to total production loss for extended periods and costly workover operations. The extent of erosive damage is determined by many factors, among which the flow and sand rates are the most significan...

全面介紹

書目詳細資料
發表在:Geomechanics and Geophysics for Geo-Energy and Geo-Resources
主要作者: 2-s2.0-85181211817
格式: Article
語言:English
出版: Springer Science and Business Media Deutschland GmbH 2024
在線閱讀:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85181211817&doi=10.1007%2fs40948-023-00723-z&partnerID=40&md5=5138e5e5bf1ddb6e595e6dca0b507969
id Mohammadian E.; Haron A.S.; Jafari M.; Liu B.; Azdarpour A.; Ostadhassan M.
spelling Mohammadian E.; Haron A.S.; Jafari M.; Liu B.; Azdarpour A.; Ostadhassan M.
2-s2.0-85181211817
Integrated sand management: modeling of sand erosion in a mature oil field in Malaysia
2024
Geomechanics and Geophysics for Geo-Energy and Geo-Resources
10
1
10.1007/s40948-023-00723-z
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85181211817&doi=10.1007%2fs40948-023-00723-z&partnerID=40&md5=5138e5e5bf1ddb6e595e6dca0b507969
Sand production can lead to various problems, including erosion in production flow lines that may lead to total production loss for extended periods and costly workover operations. The extent of erosive damage is determined by many factors, among which the flow and sand rates are the most significant. Three main issues must be addressed to ensure an efficient production operation: Sand erosion estimation, Sand monitoring (settling and deposition), and maintaining optimum production rates. If sand production exceeds certain levels, i.e., allowable sand rate, the erosion in the production network becomes problematic. Sand production has been problematic in some wells in Reservoir X. Core, and historical production data was used to build a comprehensive model using Schlumberger PIPESIM™ hydraulic modelling. The software allows for detailed modelling of the production network by which erosion rate, erosion hotspots, and deposition of the produced sand can be quantitatively analyzed. Considering an allowable erosion rate of 0.3 mm/year, the model outcomes indicate that sand erosion is critical in wells J-1, J-2, and L-2. The next step was identifying the hotspots where the produced sand is deposited in the abovementioned wells. The modelling results indicated that sand deposition is primarily severe in the teeline between the platforms. Moreover, the gas-oil ratio was identified as the most influential factor in the sand deposition. Lastly, a sensitivity analysis was conducted on the allowable flow rates and maximum (technical) allowable sand production and erosion rates to find optimum production rates from reservoir X. © 2023, The Author(s).
Springer Science and Business Media Deutschland GmbH
23638419
English
Article
All Open Access; Gold Open Access
author 2-s2.0-85181211817
spellingShingle 2-s2.0-85181211817
Integrated sand management: modeling of sand erosion in a mature oil field in Malaysia
author_facet 2-s2.0-85181211817
author_sort 2-s2.0-85181211817
title Integrated sand management: modeling of sand erosion in a mature oil field in Malaysia
title_short Integrated sand management: modeling of sand erosion in a mature oil field in Malaysia
title_full Integrated sand management: modeling of sand erosion in a mature oil field in Malaysia
title_fullStr Integrated sand management: modeling of sand erosion in a mature oil field in Malaysia
title_full_unstemmed Integrated sand management: modeling of sand erosion in a mature oil field in Malaysia
title_sort Integrated sand management: modeling of sand erosion in a mature oil field in Malaysia
publishDate 2024
container_title Geomechanics and Geophysics for Geo-Energy and Geo-Resources
container_volume 10
container_issue 1
doi_str_mv 10.1007/s40948-023-00723-z
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85181211817&doi=10.1007%2fs40948-023-00723-z&partnerID=40&md5=5138e5e5bf1ddb6e595e6dca0b507969
description Sand production can lead to various problems, including erosion in production flow lines that may lead to total production loss for extended periods and costly workover operations. The extent of erosive damage is determined by many factors, among which the flow and sand rates are the most significant. Three main issues must be addressed to ensure an efficient production operation: Sand erosion estimation, Sand monitoring (settling and deposition), and maintaining optimum production rates. If sand production exceeds certain levels, i.e., allowable sand rate, the erosion in the production network becomes problematic. Sand production has been problematic in some wells in Reservoir X. Core, and historical production data was used to build a comprehensive model using Schlumberger PIPESIM™ hydraulic modelling. The software allows for detailed modelling of the production network by which erosion rate, erosion hotspots, and deposition of the produced sand can be quantitatively analyzed. Considering an allowable erosion rate of 0.3 mm/year, the model outcomes indicate that sand erosion is critical in wells J-1, J-2, and L-2. The next step was identifying the hotspots where the produced sand is deposited in the abovementioned wells. The modelling results indicated that sand deposition is primarily severe in the teeline between the platforms. Moreover, the gas-oil ratio was identified as the most influential factor in the sand deposition. Lastly, a sensitivity analysis was conducted on the allowable flow rates and maximum (technical) allowable sand production and erosion rates to find optimum production rates from reservoir X. © 2023, The Author(s).
publisher Springer Science and Business Media Deutschland GmbH
issn 23638419
language English
format Article
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1828987859748519936