THE DELAY OF PLANNING PERMISSION APPLICATION OF TAHFIZ INSTITUTION IN SELANGOR
This paper investigates the delays in planning permission applications for Tahfiz institutions in Selangor. Malaysia experiences a significant number of illegal constructions that are built without the required planning licences, primarily due to insufficient monitoring and enforcement by local auth...
Published in: | Planning Malaysia |
---|---|
Main Author: | Marzukhi M.A.; Zulkefly N.S. |
Format: | Article |
Language: | English |
Published: |
Malaysian Institute Of Planners
2025
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85217652315&doi=10.21837%2fpm.v23i35.1664&partnerID=40&md5=17e5b8dcdfa5184ccff374550529d74a |
Similar Items
-
Integration of Tahfiz and Academic Education
by: Abdullah, et al.
Published: (2024) -
Determinants of estate planning behaviour in Malaysia: An institutional theory perspective
by: Basir F.A.M.; Ahmad W.M.W.; Rahman M.
Published: (2024) -
Effects of varying fiber length towards packet delay in Passive Optical Network
by: Radzi N.A.M.; Ridwan M.A.; Abdullah F.; Din N.M.; Al-Mansoori M.H.; Abidin H.Z.
Published: (2017) -
Effect of Transmission Delay and tunneled traffic in A wireless mobile IP network
by: Samad M.; Kasim N.S.M.
Published: (2006) -
An Unusual Delayed Complication of Rib Graft Microtia Reconstruction After Two Decades: A Case Report
by: Tuang G.J.; Mansor M.; Abdullah A.
Published: (2022)