DETERMINATION OF STANDARD TIME FOR BISCUIT PACKAGING PROCESSING

A firm named PT. XYZ specializes in the production of biscuits, wafers, and chocolate chips. The biscuit production process encompasses several stages, beginning with the collection of raw materials in the warehouse, followed by weighing them according to the recipe, and culminating in packaging and...

Full description

Bibliographic Details
Published in:Jurnal Mekanikal
Main Author: Panjaitan N.; Zubair A.F.; Sari D.Y.; Kembaren A.
Format: Article
Language:English
Published: Penerbit UTM Press 2024
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85214376124&doi=10.11113%2fjm.v47.546&partnerID=40&md5=fa86ab2a188c86a275127a54da63f51d
id 2-s2.0-85214376124
spelling 2-s2.0-85214376124
Panjaitan N.; Zubair A.F.; Sari D.Y.; Kembaren A.
DETERMINATION OF STANDARD TIME FOR BISCUIT PACKAGING PROCESSING
2024
Jurnal Mekanikal
47

10.11113/jm.v47.546
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85214376124&doi=10.11113%2fjm.v47.546&partnerID=40&md5=fa86ab2a188c86a275127a54da63f51d
A firm named PT. XYZ specializes in the production of biscuits, wafers, and chocolate chips. The biscuit production process encompasses several stages, beginning with the collection of raw materials in the warehouse, followed by weighing them according to the recipe, and culminating in packaging and storage in the finished product warehouse. A problem arose during the packaging stage in the first work shift, where production fell short of the target only 200 cartons of biscuits were produced compared to the goal of 250 cartons per shift. To address this issue, standard time calculations will be conducted. The research process involves observing cycle times in the packaging process, testing data adequacy, ensuring data uniformity, identifying rating factors, calculating normal time, identifying allowances, determining standard time, and calculating labor requirements, utilizing a stopwatch to measure the necessary work time accurately. The calculated standard time for secondary packaging is 75.683 seconds, while for tertiary packaging it is 53.409 seconds. Based on these results, it is determined that an additional eighteen workers are needed for secondary packaging, and two more workers are required for tertiary packaging. © 2024 Penerbit UTM Press. All rights reserved.
Penerbit UTM Press
22893873
English
Article

author Panjaitan N.; Zubair A.F.; Sari D.Y.; Kembaren A.
spellingShingle Panjaitan N.; Zubair A.F.; Sari D.Y.; Kembaren A.
DETERMINATION OF STANDARD TIME FOR BISCUIT PACKAGING PROCESSING
author_facet Panjaitan N.; Zubair A.F.; Sari D.Y.; Kembaren A.
author_sort Panjaitan N.; Zubair A.F.; Sari D.Y.; Kembaren A.
title DETERMINATION OF STANDARD TIME FOR BISCUIT PACKAGING PROCESSING
title_short DETERMINATION OF STANDARD TIME FOR BISCUIT PACKAGING PROCESSING
title_full DETERMINATION OF STANDARD TIME FOR BISCUIT PACKAGING PROCESSING
title_fullStr DETERMINATION OF STANDARD TIME FOR BISCUIT PACKAGING PROCESSING
title_full_unstemmed DETERMINATION OF STANDARD TIME FOR BISCUIT PACKAGING PROCESSING
title_sort DETERMINATION OF STANDARD TIME FOR BISCUIT PACKAGING PROCESSING
publishDate 2024
container_title Jurnal Mekanikal
container_volume 47
container_issue
doi_str_mv 10.11113/jm.v47.546
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85214376124&doi=10.11113%2fjm.v47.546&partnerID=40&md5=fa86ab2a188c86a275127a54da63f51d
description A firm named PT. XYZ specializes in the production of biscuits, wafers, and chocolate chips. The biscuit production process encompasses several stages, beginning with the collection of raw materials in the warehouse, followed by weighing them according to the recipe, and culminating in packaging and storage in the finished product warehouse. A problem arose during the packaging stage in the first work shift, where production fell short of the target only 200 cartons of biscuits were produced compared to the goal of 250 cartons per shift. To address this issue, standard time calculations will be conducted. The research process involves observing cycle times in the packaging process, testing data adequacy, ensuring data uniformity, identifying rating factors, calculating normal time, identifying allowances, determining standard time, and calculating labor requirements, utilizing a stopwatch to measure the necessary work time accurately. The calculated standard time for secondary packaging is 75.683 seconds, while for tertiary packaging it is 53.409 seconds. Based on these results, it is determined that an additional eighteen workers are needed for secondary packaging, and two more workers are required for tertiary packaging. © 2024 Penerbit UTM Press. All rights reserved.
publisher Penerbit UTM Press
issn 22893873
language English
format Article
accesstype
record_format scopus
collection Scopus
_version_ 1823296152213127168