Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects

Cost overruns are typical in infrastructure projects all around the world. However, previous studies have shown a lack of understanding of the term complexity in the construction industry, specifically regarding infrastructure projects. This paper is part of the research project, which aims to ident...

Full description

Bibliographic Details
Published in:Green Infrastructure: Materials and Sustainable Management
Main Author: Che Nen A.N.; Mat Isa C.M.; Che Ibrahim C.K.I.; Mohmad Shariff M.S.
Format: Book chapter
Language:English
Published: Springer Nature 2024
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85205659064&doi=10.1007%2f978-981-99-7003-2_2&partnerID=40&md5=e871e6d2f1207f5af58fcfceef00ab73
id 2-s2.0-85205659064
spelling 2-s2.0-85205659064
Che Nen A.N.; Mat Isa C.M.; Che Ibrahim C.K.I.; Mohmad Shariff M.S.
Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects
2024
Green Infrastructure: Materials and Sustainable Management


10.1007/978-981-99-7003-2_2
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85205659064&doi=10.1007%2f978-981-99-7003-2_2&partnerID=40&md5=e871e6d2f1207f5af58fcfceef00ab73
Cost overruns are typical in infrastructure projects all around the world. However, previous studies have shown a lack of understanding of the term complexity in the construction industry, specifically regarding infrastructure projects. This paper is part of the research project, which aims to identify the most significant complexity factors contributing to project performance and develop a complexity assessment model for infrastructure projects. This paper aims to categorize and rank the complexity factors affecting the cost performance of infrastructure projects during the pre-construction stage. A survey questionnaire was designed to identify complexity factors affecting infrastructure project cost performance during the pre-construction phases. One hundred and six (106) managers consisting of clients, consultants, contractors, sub-contractors, and others involved in infrastructure projects have responded to the survey. Using Rasch Model Analysis, the significant complexity factors with logit measure ranges show that these complexity factors are critical and vastly impact infrastructure project cost performance. The following six (6) most significant pre-construction complexity factors affecting cost performance (PRECO) have been identified: original design errors, low bid award that is qualified or non-compliant, redesign because over-budgeted, lack of optimization cost and time, lack of design coordination information between consultant and client, and unit prices that are not properly specified or evaluated. This study contributes to integrating complexity assessment for infrastructure projects during the pre-construction life cycle in line with the Twelfth Malaysia Plan for the construction industry. © The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd. 2023.
Springer Nature

English
Book chapter

author Che Nen A.N.; Mat Isa C.M.; Che Ibrahim C.K.I.; Mohmad Shariff M.S.
spellingShingle Che Nen A.N.; Mat Isa C.M.; Che Ibrahim C.K.I.; Mohmad Shariff M.S.
Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects
author_facet Che Nen A.N.; Mat Isa C.M.; Che Ibrahim C.K.I.; Mohmad Shariff M.S.
author_sort Che Nen A.N.; Mat Isa C.M.; Che Ibrahim C.K.I.; Mohmad Shariff M.S.
title Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects
title_short Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects
title_full Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects
title_fullStr Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects
title_full_unstemmed Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects
title_sort Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects
publishDate 2024
container_title Green Infrastructure: Materials and Sustainable Management
container_volume
container_issue
doi_str_mv 10.1007/978-981-99-7003-2_2
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85205659064&doi=10.1007%2f978-981-99-7003-2_2&partnerID=40&md5=e871e6d2f1207f5af58fcfceef00ab73
description Cost overruns are typical in infrastructure projects all around the world. However, previous studies have shown a lack of understanding of the term complexity in the construction industry, specifically regarding infrastructure projects. This paper is part of the research project, which aims to identify the most significant complexity factors contributing to project performance and develop a complexity assessment model for infrastructure projects. This paper aims to categorize and rank the complexity factors affecting the cost performance of infrastructure projects during the pre-construction stage. A survey questionnaire was designed to identify complexity factors affecting infrastructure project cost performance during the pre-construction phases. One hundred and six (106) managers consisting of clients, consultants, contractors, sub-contractors, and others involved in infrastructure projects have responded to the survey. Using Rasch Model Analysis, the significant complexity factors with logit measure ranges show that these complexity factors are critical and vastly impact infrastructure project cost performance. The following six (6) most significant pre-construction complexity factors affecting cost performance (PRECO) have been identified: original design errors, low bid award that is qualified or non-compliant, redesign because over-budgeted, lack of optimization cost and time, lack of design coordination information between consultant and client, and unit prices that are not properly specified or evaluated. This study contributes to integrating complexity assessment for infrastructure projects during the pre-construction life cycle in line with the Twelfth Malaysia Plan for the construction industry. © The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd. 2023.
publisher Springer Nature
issn
language English
format Book chapter
accesstype
record_format scopus
collection Scopus
_version_ 1814778501864095744