OPERATIONAL COST MODELS FOR AN EARTH STATION SYSTEM USING 2-PARALLEL AND 4- PARALLEL CONFIGURATIONS

Operational cost is important in any system. In the case of the earth station system, operational cost is very crucial. The operational cost can be divided into three costs: maintenance, failure, and replacement costs. There are many complex subsystems incorporated in the earth station system, for i...

Full description

Bibliographic Details
Published in:IIUM Engineering Journal
Main Author: Aris W.M.S.W.; Rahim N.A.; Mansor M.M.; Rahman N.S.A.
Format: Article
Language:English
Published: International Islamic University Malaysia-IIUM 2024
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85199755447&doi=10.31436%2fiiumej.v25i2.3063&partnerID=40&md5=42fe9e5a9f072cf267c493829309a846
id 2-s2.0-85199755447
spelling 2-s2.0-85199755447
Aris W.M.S.W.; Rahim N.A.; Mansor M.M.; Rahman N.S.A.
OPERATIONAL COST MODELS FOR AN EARTH STATION SYSTEM USING 2-PARALLEL AND 4- PARALLEL CONFIGURATIONS
2024
IIUM Engineering Journal
25
2
10.31436/iiumej.v25i2.3063
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85199755447&doi=10.31436%2fiiumej.v25i2.3063&partnerID=40&md5=42fe9e5a9f072cf267c493829309a846
Operational cost is important in any system. In the case of the earth station system, operational cost is very crucial. The operational cost can be divided into three costs: maintenance, failure, and replacement costs. There are many complex subsystems incorporated in the earth station system, for instance a high-power amplifier, modulators, and antennas, to name a few. In this research, only the replacement cost was considered. Moreover, there are many replacement methods that are available. These replacement methods implicitly influence both the replacement and the replacement costs. The aim of this research is to provide a new cost model based on which replacement method yields the lowest cost. Two replacement methods are involved in this research: failure-triggered and age-based. The failure-triggered and the age-based replacement methods were considered because these methods are the most used in previous research work. Furthermore, three types of cost models were also considered, and they were linear, polynomial, and exponential operational cost models. The outcomes show that the failure-triggered and age-based replacement methods of 2-parallel configuration of polynomial and linear operational cost models yielded the lowest RMSE value of 2.5. Therefore, both polynomial and linear operational cost models of the 2-parallel configuration were the most optimal operational cost models. © (2024), (International Islamic University Malaysia-IIUM). All rights reserved.
International Islamic University Malaysia-IIUM
1511788X
English
Article
All Open Access; Gold Open Access
author Aris W.M.S.W.; Rahim N.A.; Mansor M.M.; Rahman N.S.A.
spellingShingle Aris W.M.S.W.; Rahim N.A.; Mansor M.M.; Rahman N.S.A.
OPERATIONAL COST MODELS FOR AN EARTH STATION SYSTEM USING 2-PARALLEL AND 4- PARALLEL CONFIGURATIONS
author_facet Aris W.M.S.W.; Rahim N.A.; Mansor M.M.; Rahman N.S.A.
author_sort Aris W.M.S.W.; Rahim N.A.; Mansor M.M.; Rahman N.S.A.
title OPERATIONAL COST MODELS FOR AN EARTH STATION SYSTEM USING 2-PARALLEL AND 4- PARALLEL CONFIGURATIONS
title_short OPERATIONAL COST MODELS FOR AN EARTH STATION SYSTEM USING 2-PARALLEL AND 4- PARALLEL CONFIGURATIONS
title_full OPERATIONAL COST MODELS FOR AN EARTH STATION SYSTEM USING 2-PARALLEL AND 4- PARALLEL CONFIGURATIONS
title_fullStr OPERATIONAL COST MODELS FOR AN EARTH STATION SYSTEM USING 2-PARALLEL AND 4- PARALLEL CONFIGURATIONS
title_full_unstemmed OPERATIONAL COST MODELS FOR AN EARTH STATION SYSTEM USING 2-PARALLEL AND 4- PARALLEL CONFIGURATIONS
title_sort OPERATIONAL COST MODELS FOR AN EARTH STATION SYSTEM USING 2-PARALLEL AND 4- PARALLEL CONFIGURATIONS
publishDate 2024
container_title IIUM Engineering Journal
container_volume 25
container_issue 2
doi_str_mv 10.31436/iiumej.v25i2.3063
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85199755447&doi=10.31436%2fiiumej.v25i2.3063&partnerID=40&md5=42fe9e5a9f072cf267c493829309a846
description Operational cost is important in any system. In the case of the earth station system, operational cost is very crucial. The operational cost can be divided into three costs: maintenance, failure, and replacement costs. There are many complex subsystems incorporated in the earth station system, for instance a high-power amplifier, modulators, and antennas, to name a few. In this research, only the replacement cost was considered. Moreover, there are many replacement methods that are available. These replacement methods implicitly influence both the replacement and the replacement costs. The aim of this research is to provide a new cost model based on which replacement method yields the lowest cost. Two replacement methods are involved in this research: failure-triggered and age-based. The failure-triggered and the age-based replacement methods were considered because these methods are the most used in previous research work. Furthermore, three types of cost models were also considered, and they were linear, polynomial, and exponential operational cost models. The outcomes show that the failure-triggered and age-based replacement methods of 2-parallel configuration of polynomial and linear operational cost models yielded the lowest RMSE value of 2.5. Therefore, both polynomial and linear operational cost models of the 2-parallel configuration were the most optimal operational cost models. © (2024), (International Islamic University Malaysia-IIUM). All rights reserved.
publisher International Islamic University Malaysia-IIUM
issn 1511788X
language English
format Article
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1814778502869680128