Early warning system for headwater risk in Johor Eco-Park: First development life cycle report

The headwater phenomenon is common in tropical waterfall and upper stream of Johor Eco-Park and threatens the visitors. Prior to that, an IoT system has been developed to issue early warning alert to the eco-park users on headwater risk. This paper presents the first life cyclereport for the early h...

Full description

Bibliographic Details
Published in:IOP Conference Series: Earth and Environmental Science
Main Author: Mahmud M.R.; Reba M.N.M.; Aman S.; Mahli A.R.; Awang N.W.
Format: Conference paper
Language:English
Published: Institute of Physics 2024
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85198454408&doi=10.1088%2f1755-1315%2f1369%2f1%2f012007&partnerID=40&md5=6899448ff6c8f2c8cea96d7216322f8f
id 2-s2.0-85198454408
spelling 2-s2.0-85198454408
Mahmud M.R.; Reba M.N.M.; Aman S.; Mahli A.R.; Awang N.W.
Early warning system for headwater risk in Johor Eco-Park: First development life cycle report
2024
IOP Conference Series: Earth and Environmental Science
1369
1
10.1088/1755-1315/1369/1/012007
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85198454408&doi=10.1088%2f1755-1315%2f1369%2f1%2f012007&partnerID=40&md5=6899448ff6c8f2c8cea96d7216322f8f
The headwater phenomenon is common in tropical waterfall and upper stream of Johor Eco-Park and threatens the visitors. Prior to that, an IoT system has been developed to issue early warning alert to the eco-park users on headwater risk. This paper presents the first life cyclereport for the early headwater risk system in Gunung Pulai and Gunung Belumut Eco Park. Adapting the spiral development life cycle (SDLC), the system has completed its first completespiral cycle whereas it has been implemented. This first SDLC report consists of four different parts: (i) problem and risk management, (ii) framework, (iii) system development, and (iv) testing and implementation. The alert on the site was triggered by the warning siren at the strategic locations. Simultaneously, the alert was also triggered in the websystem and phone application to the eco-park management and prospective users to prevent fromentering the premises. An auto generated report were also issued to provide potential disaster information for further action from the respective authorities. The developed system is subjected to be improved in the 2nd cycle by addressing several drawbacks including telecommunication signals, noise minimization, and threats from wild animals to the devices. © 2024 Institute of Physics Publishing. All rights reserved.
Institute of Physics
17551307
English
Conference paper
All Open Access; Gold Open Access
author Mahmud M.R.; Reba M.N.M.; Aman S.; Mahli A.R.; Awang N.W.
spellingShingle Mahmud M.R.; Reba M.N.M.; Aman S.; Mahli A.R.; Awang N.W.
Early warning system for headwater risk in Johor Eco-Park: First development life cycle report
author_facet Mahmud M.R.; Reba M.N.M.; Aman S.; Mahli A.R.; Awang N.W.
author_sort Mahmud M.R.; Reba M.N.M.; Aman S.; Mahli A.R.; Awang N.W.
title Early warning system for headwater risk in Johor Eco-Park: First development life cycle report
title_short Early warning system for headwater risk in Johor Eco-Park: First development life cycle report
title_full Early warning system for headwater risk in Johor Eco-Park: First development life cycle report
title_fullStr Early warning system for headwater risk in Johor Eco-Park: First development life cycle report
title_full_unstemmed Early warning system for headwater risk in Johor Eco-Park: First development life cycle report
title_sort Early warning system for headwater risk in Johor Eco-Park: First development life cycle report
publishDate 2024
container_title IOP Conference Series: Earth and Environmental Science
container_volume 1369
container_issue 1
doi_str_mv 10.1088/1755-1315/1369/1/012007
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85198454408&doi=10.1088%2f1755-1315%2f1369%2f1%2f012007&partnerID=40&md5=6899448ff6c8f2c8cea96d7216322f8f
description The headwater phenomenon is common in tropical waterfall and upper stream of Johor Eco-Park and threatens the visitors. Prior to that, an IoT system has been developed to issue early warning alert to the eco-park users on headwater risk. This paper presents the first life cyclereport for the early headwater risk system in Gunung Pulai and Gunung Belumut Eco Park. Adapting the spiral development life cycle (SDLC), the system has completed its first completespiral cycle whereas it has been implemented. This first SDLC report consists of four different parts: (i) problem and risk management, (ii) framework, (iii) system development, and (iv) testing and implementation. The alert on the site was triggered by the warning siren at the strategic locations. Simultaneously, the alert was also triggered in the websystem and phone application to the eco-park management and prospective users to prevent fromentering the premises. An auto generated report were also issued to provide potential disaster information for further action from the respective authorities. The developed system is subjected to be improved in the 2nd cycle by addressing several drawbacks including telecommunication signals, noise minimization, and threats from wild animals to the devices. © 2024 Institute of Physics Publishing. All rights reserved.
publisher Institute of Physics
issn 17551307
language English
format Conference paper
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1809678474310320128