A Systematic Review of Space Outlining in Lean and Takt Application

Construction is a complicated process with many unknowns. As a result, planning and scheduling a construction project is a difficult task. A dedicated workspace is required for each person in a building construction project to carry out the required tasks. In this environment, improper workspace pla...

Full description

Bibliographic Details
Published in:Lecture Notes in Civil Engineering
Main Author: Zakariah Z.; Hassan S.H.
Format: Conference paper
Language:English
Published: Springer Science and Business Media Deutschland GmbH 2024
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85180158865&doi=10.1007%2f978-981-99-6022-4_6&partnerID=40&md5=1ec21bb63336fa1b3d7b1cf282830b9b
id 2-s2.0-85180158865
spelling 2-s2.0-85180158865
Zakariah Z.; Hassan S.H.
A Systematic Review of Space Outlining in Lean and Takt Application
2024
Lecture Notes in Civil Engineering
384

10.1007/978-981-99-6022-4_6
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85180158865&doi=10.1007%2f978-981-99-6022-4_6&partnerID=40&md5=1ec21bb63336fa1b3d7b1cf282830b9b
Construction is a complicated process with many unknowns. As a result, planning and scheduling a construction project is a difficult task. A dedicated workspace is required for each person in a building construction project to carry out the required tasks. In this environment, improper workspace planning on a construction site leads to workspace issues, which leads to a loss of productivity, safety risks, and poor-quality issues. As a result, one of the most critical resources and restrictions to manage on a building site is the workspace. When it comes to planning and scheduling stages, space management is always overlooked. As a result, the current study is primarily concerned with identifying the approach that earlier researchers have suggested for space planning in the construction sector. The goal of the planning is to impose an efficient workflow that is aligned with the lean approach. Because time and zones are involved in Takt planning, it can also be linked to space variation. The study’s goal is to highlight the importance of space planning in lean construction, as well as the relationship between space planning and Takt implementation. Thus, systematic literature review (SLR) method applied in this paper revealed the current adaptation of space planning and its implementation in lean construction and Takt application. As a result, method adapted for space planning in lean construction and Takt application has been published and assist for right planning method and adapting, also lead to a better understanding and future improvements. © 2024, The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
Springer Science and Business Media Deutschland GmbH
23662557
English
Conference paper

author Zakariah Z.; Hassan S.H.
spellingShingle Zakariah Z.; Hassan S.H.
A Systematic Review of Space Outlining in Lean and Takt Application
author_facet Zakariah Z.; Hassan S.H.
author_sort Zakariah Z.; Hassan S.H.
title A Systematic Review of Space Outlining in Lean and Takt Application
title_short A Systematic Review of Space Outlining in Lean and Takt Application
title_full A Systematic Review of Space Outlining in Lean and Takt Application
title_fullStr A Systematic Review of Space Outlining in Lean and Takt Application
title_full_unstemmed A Systematic Review of Space Outlining in Lean and Takt Application
title_sort A Systematic Review of Space Outlining in Lean and Takt Application
publishDate 2024
container_title Lecture Notes in Civil Engineering
container_volume 384
container_issue
doi_str_mv 10.1007/978-981-99-6022-4_6
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85180158865&doi=10.1007%2f978-981-99-6022-4_6&partnerID=40&md5=1ec21bb63336fa1b3d7b1cf282830b9b
description Construction is a complicated process with many unknowns. As a result, planning and scheduling a construction project is a difficult task. A dedicated workspace is required for each person in a building construction project to carry out the required tasks. In this environment, improper workspace planning on a construction site leads to workspace issues, which leads to a loss of productivity, safety risks, and poor-quality issues. As a result, one of the most critical resources and restrictions to manage on a building site is the workspace. When it comes to planning and scheduling stages, space management is always overlooked. As a result, the current study is primarily concerned with identifying the approach that earlier researchers have suggested for space planning in the construction sector. The goal of the planning is to impose an efficient workflow that is aligned with the lean approach. Because time and zones are involved in Takt planning, it can also be linked to space variation. The study’s goal is to highlight the importance of space planning in lean construction, as well as the relationship between space planning and Takt implementation. Thus, systematic literature review (SLR) method applied in this paper revealed the current adaptation of space planning and its implementation in lean construction and Takt application. As a result, method adapted for space planning in lean construction and Takt application has been published and assist for right planning method and adapting, also lead to a better understanding and future improvements. © 2024, The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
publisher Springer Science and Business Media Deutschland GmbH
issn 23662557
language English
format Conference paper
accesstype
record_format scopus
collection Scopus
_version_ 1809678476727287808