A thematic review on the current trends of contractual barriers and challenges concerning building information modelling (BIM)

Building information modelling (BIM) is mostly referred to as a collaborative network comprising various disciplines and project stakeholders to execute BIM-based activities such as design, construction and planning for asset operation from the early stages. Fostering BIM processes from the planning...

Full description

Bibliographic Details
Published in:AIP Conference Proceedings
Main Author: Alwee S.N.A.S.; Salleh H.; Zolkafli-Zulkifly U.K.; Jamil A.H.A.
Format: Conference paper
Language:English
Published: American Institute of Physics Inc. 2023
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85176808091&doi=10.1063%2f5.0167801&partnerID=40&md5=ec9fd89dd1fde58e1552947deac49689
id 2-s2.0-85176808091
spelling 2-s2.0-85176808091
Alwee S.N.A.S.; Salleh H.; Zolkafli-Zulkifly U.K.; Jamil A.H.A.
A thematic review on the current trends of contractual barriers and challenges concerning building information modelling (BIM)
2023
AIP Conference Proceedings
2881
1
10.1063/5.0167801
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85176808091&doi=10.1063%2f5.0167801&partnerID=40&md5=ec9fd89dd1fde58e1552947deac49689
Building information modelling (BIM) is mostly referred to as a collaborative network comprising various disciplines and project stakeholders to execute BIM-based activities such as design, construction and planning for asset operation from the early stages. Fostering BIM processes from the planning phase is crucial. However, previous scholars who are concerned about the implications for current practice have discussed many barriers and challenges related to BIM-based contractual aspects. The present study reviews the current literature on the barriers and challenges of the last 12 years (2010-2022). A total of 31 articles were carefully reviewed using the thematic approach to provide the theoretical lens, which consisted of five elements related to contractual barriers and challenges of BIM implementation. The findings identified that professional liability, time limitation, cost implication, quality performance, and team coordination are the main factors that could affect the successful implementation of BIM in construction projects. The results and findings propose a new framework that must be considered to solve the contractual impediments for future BIM utilisation. This study also suggested that future research should focus on BIM approaches that can improve current contractual considerations for project and construction management. © 2023 Author(s).
American Institute of Physics Inc.
0094243X
English
Conference paper

author Alwee S.N.A.S.; Salleh H.; Zolkafli-Zulkifly U.K.; Jamil A.H.A.
spellingShingle Alwee S.N.A.S.; Salleh H.; Zolkafli-Zulkifly U.K.; Jamil A.H.A.
A thematic review on the current trends of contractual barriers and challenges concerning building information modelling (BIM)
author_facet Alwee S.N.A.S.; Salleh H.; Zolkafli-Zulkifly U.K.; Jamil A.H.A.
author_sort Alwee S.N.A.S.; Salleh H.; Zolkafli-Zulkifly U.K.; Jamil A.H.A.
title A thematic review on the current trends of contractual barriers and challenges concerning building information modelling (BIM)
title_short A thematic review on the current trends of contractual barriers and challenges concerning building information modelling (BIM)
title_full A thematic review on the current trends of contractual barriers and challenges concerning building information modelling (BIM)
title_fullStr A thematic review on the current trends of contractual barriers and challenges concerning building information modelling (BIM)
title_full_unstemmed A thematic review on the current trends of contractual barriers and challenges concerning building information modelling (BIM)
title_sort A thematic review on the current trends of contractual barriers and challenges concerning building information modelling (BIM)
publishDate 2023
container_title AIP Conference Proceedings
container_volume 2881
container_issue 1
doi_str_mv 10.1063/5.0167801
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85176808091&doi=10.1063%2f5.0167801&partnerID=40&md5=ec9fd89dd1fde58e1552947deac49689
description Building information modelling (BIM) is mostly referred to as a collaborative network comprising various disciplines and project stakeholders to execute BIM-based activities such as design, construction and planning for asset operation from the early stages. Fostering BIM processes from the planning phase is crucial. However, previous scholars who are concerned about the implications for current practice have discussed many barriers and challenges related to BIM-based contractual aspects. The present study reviews the current literature on the barriers and challenges of the last 12 years (2010-2022). A total of 31 articles were carefully reviewed using the thematic approach to provide the theoretical lens, which consisted of five elements related to contractual barriers and challenges of BIM implementation. The findings identified that professional liability, time limitation, cost implication, quality performance, and team coordination are the main factors that could affect the successful implementation of BIM in construction projects. The results and findings propose a new framework that must be considered to solve the contractual impediments for future BIM utilisation. This study also suggested that future research should focus on BIM approaches that can improve current contractual considerations for project and construction management. © 2023 Author(s).
publisher American Institute of Physics Inc.
issn 0094243X
language English
format Conference paper
accesstype
record_format scopus
collection Scopus
_version_ 1809678016343703552