Exploring the Direct & Indirect Costs of Accident: An Empirical Analysis for KVMRT Projects in Malaysia
The Klang Valley Mass Rapid Transit (KVMRT) System is set to be one the most important and largest transport infrastructure projects in Malaysia. Since its inception in 2011, the rapid development of the KVMRT System has contributed to a substantial amount of costs related to safety and health issue...
Published in: | International Journal of Sustainable Construction Engineering and Technology |
---|---|
Main Author: | Kamar I.F.M.; Ahmad A.C.; Kasiron M.Y. |
Format: | Article |
Language: | English |
Published: |
Penerbit UTHM
2023
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85172456541&doi=10.30880%2fijscet.2023.14.03.014&partnerID=40&md5=8124ccb1a03cd72effdcc7946c59167f |
Similar Items
-
Prevention Cost Components Priorities for Urban Rail Infrastructure Projects
by: Kamar I.F.M.; Ahmad A.C.; Derus M.M.
Published: (2022) -
DEVELOPMENT OF SAFETY AND HEALTH COSTS FORMULA (SaHeCF) FOR URBAN RAIL INFRASTRUCTURE PROJECTS IN MALAYSIA
by: Kamar I.F.M.; Ahmad A.C.; Masrom S.; Lop N.S.
Published: (2024) -
Risk assessment of piling work for mass rapid transit (MRT) construction project
by: Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S.
Published: (2019) -
EXPLORING INTEGRATED MANAGEMENT SYSTEM (IMS) TOWARDS MINIMISING CONSTRUCTION ACCIDENTS
by: Leh A.C.; Ahmad A.C.; Karim S.A.Q.S.A.
Published: (2022) -
Assessing the Impact of Technology Advancement and Foreign Direct Investment on Energy Utilization in Malaysia: An Empirical Exploration with Boundary Estimation
by: Ridzuan A.R.; Rahman N.H.A.; Singh K.S.J.; Borhan H.; Ridwan M.; Voumik L.C.; Ali M.
Published: (2024)