Fault detection using acceptance ratio analysis on polycrystalline grid-connected photovoltaics system

Around the world, electricity generation from PV photovoltaic systems is increasing, achieving 10-20% PV system efficiency. However, PV systems degrade due to the technology and the operating conditions and become worse in tropical climate countries. Hence, degradation is one of the key performance...

Full description

Bibliographic Details
Published in:International Journal of Power Electronics and Drive Systems
Main Author: Muhammad N.; Roland F.; Zainuddin H.
Format: Article
Language:English
Published: Institute of Advanced Engineering and Science 2023
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85150477757&doi=10.11591%2fijpeds.v14.i2.pp1098-1109&partnerID=40&md5=9a3a976f7300a56897dea495f9fca1c0
id 2-s2.0-85150477757
spelling 2-s2.0-85150477757
Muhammad N.; Roland F.; Zainuddin H.
Fault detection using acceptance ratio analysis on polycrystalline grid-connected photovoltaics system
2023
International Journal of Power Electronics and Drive Systems
14
2
10.11591/ijpeds.v14.i2.pp1098-1109
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85150477757&doi=10.11591%2fijpeds.v14.i2.pp1098-1109&partnerID=40&md5=9a3a976f7300a56897dea495f9fca1c0
Around the world, electricity generation from PV photovoltaic systems is increasing, achieving 10-20% PV system efficiency. However, PV systems degrade due to the technology and the operating conditions and become worse in tropical climate countries. Hence, degradation is one of the key performance indicators for the reliability assessment of a PV system. This paper presents the acceptance ratio (AR) analysis grid-connected photovoltaic (GCPV) located on the campus of the Universiti Teknologi MARA, Shah Alam, Malaysia as the key performance indicators. A comparative analysis of the actual and predicted AC Power and AR of the polycrystalline GCPV system is carried out over monitoring of a one-year period. MATLAB software is chosen to simulate the output power using actual data. Malaysian Standard MS2692:2020 has noted that the AR value must ≥ 0.9 to classify as accepted in testing and commissioning tests and AR < 0.9 has been indicated as a non-accepted GCPV system. The results of acceptance ratio (AR), yield (Y), specific yield (SY), and performance ratio (PR) show that almost half of the AR’s data results show below 0.9 with the performance ratio of PV systems was less than 75%, indicating that the systems needed to be completely replaced. © 2023, Institute of Advanced Engineering and Science. All rights reserved.
Institute of Advanced Engineering and Science
20888694
English
Article
All Open Access; Gold Open Access; Green Open Access
author Muhammad N.; Roland F.; Zainuddin H.
spellingShingle Muhammad N.; Roland F.; Zainuddin H.
Fault detection using acceptance ratio analysis on polycrystalline grid-connected photovoltaics system
author_facet Muhammad N.; Roland F.; Zainuddin H.
author_sort Muhammad N.; Roland F.; Zainuddin H.
title Fault detection using acceptance ratio analysis on polycrystalline grid-connected photovoltaics system
title_short Fault detection using acceptance ratio analysis on polycrystalline grid-connected photovoltaics system
title_full Fault detection using acceptance ratio analysis on polycrystalline grid-connected photovoltaics system
title_fullStr Fault detection using acceptance ratio analysis on polycrystalline grid-connected photovoltaics system
title_full_unstemmed Fault detection using acceptance ratio analysis on polycrystalline grid-connected photovoltaics system
title_sort Fault detection using acceptance ratio analysis on polycrystalline grid-connected photovoltaics system
publishDate 2023
container_title International Journal of Power Electronics and Drive Systems
container_volume 14
container_issue 2
doi_str_mv 10.11591/ijpeds.v14.i2.pp1098-1109
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85150477757&doi=10.11591%2fijpeds.v14.i2.pp1098-1109&partnerID=40&md5=9a3a976f7300a56897dea495f9fca1c0
description Around the world, electricity generation from PV photovoltaic systems is increasing, achieving 10-20% PV system efficiency. However, PV systems degrade due to the technology and the operating conditions and become worse in tropical climate countries. Hence, degradation is one of the key performance indicators for the reliability assessment of a PV system. This paper presents the acceptance ratio (AR) analysis grid-connected photovoltaic (GCPV) located on the campus of the Universiti Teknologi MARA, Shah Alam, Malaysia as the key performance indicators. A comparative analysis of the actual and predicted AC Power and AR of the polycrystalline GCPV system is carried out over monitoring of a one-year period. MATLAB software is chosen to simulate the output power using actual data. Malaysian Standard MS2692:2020 has noted that the AR value must ≥ 0.9 to classify as accepted in testing and commissioning tests and AR < 0.9 has been indicated as a non-accepted GCPV system. The results of acceptance ratio (AR), yield (Y), specific yield (SY), and performance ratio (PR) show that almost half of the AR’s data results show below 0.9 with the performance ratio of PV systems was less than 75%, indicating that the systems needed to be completely replaced. © 2023, Institute of Advanced Engineering and Science. All rights reserved.
publisher Institute of Advanced Engineering and Science
issn 20888694
language English
format Article
accesstype All Open Access; Gold Open Access; Green Open Access
record_format scopus
collection Scopus
_version_ 1809677582891745280