A Comparative Study on Risk Allocation for Different Procurement Type in Malaysian Industry

Risk allocation is one of the important aspects in risk management. However, there is a tendency that risks in construction are being allocated to parties that are least able to resist taking on the risk rather than parties that are more capable to manage the risks. There are different types of proc...

Full description

Bibliographic Details
Published in:IOP Conference Series: Earth and Environmental Science
Main Author: Zainudin N.A.; Adnan H.; Baharuddin H.E.A.; Rosman M.R.; Ismail W.N.W.
Format: Conference paper
Language:English
Published: Institute of Physics 2022
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142283107&doi=10.1088%2f1755-1315%2f1067%2f1%2f012066&partnerID=40&md5=a49e5b597673ca4a40d26f3fcb856571
id 2-s2.0-85142283107
spelling 2-s2.0-85142283107
Zainudin N.A.; Adnan H.; Baharuddin H.E.A.; Rosman M.R.; Ismail W.N.W.
A Comparative Study on Risk Allocation for Different Procurement Type in Malaysian Industry
2022
IOP Conference Series: Earth and Environmental Science
1067
1
10.1088/1755-1315/1067/1/012066
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142283107&doi=10.1088%2f1755-1315%2f1067%2f1%2f012066&partnerID=40&md5=a49e5b597673ca4a40d26f3fcb856571
Risk allocation is one of the important aspects in risk management. However, there is a tendency that risks in construction are being allocated to parties that are least able to resist taking on the risk rather than parties that are more capable to manage the risks. There are different types of procurement that led to different approaches in settling risk allocation between contracting parties. This paper aims to identify risk allocation for different procurement types in construction projects focusing on traditional, design-build and public-private partnership procurement. For this research, a quantitative method was used, where 354 sets of questionnaires were distributed to selected construction firms in Klang Valley. Ninety-two (92) sets of questionnaires were returned and analyzed and the respondents were asked to rate the probability of risk occurrence. The result indicated that the top ranked risk factors are 'unstable government', 'delay in project approvals and permits', 'fluctuation of material cost', 'poorly written contract' and 'inadequate specification in contract'. The recommended risk allocation by respondent for each procurement is presented and found that client and contractor in Traditional procurement, the risks are allocate based on its nature of work. In Design-build, risk factors are mainly allocated to contractor. While in PPP, both contracting parties prefer the majority of the risk factors to be shared. The results of this research will assist practitioners in allocating risks to the party that most qualified to analyze, control, and manage these risks. © 2022 Institute of Physics Publishing. All rights reserved.
Institute of Physics
17551307
English
Conference paper
All Open Access; Gold Open Access
author Zainudin N.A.; Adnan H.; Baharuddin H.E.A.; Rosman M.R.; Ismail W.N.W.
spellingShingle Zainudin N.A.; Adnan H.; Baharuddin H.E.A.; Rosman M.R.; Ismail W.N.W.
A Comparative Study on Risk Allocation for Different Procurement Type in Malaysian Industry
author_facet Zainudin N.A.; Adnan H.; Baharuddin H.E.A.; Rosman M.R.; Ismail W.N.W.
author_sort Zainudin N.A.; Adnan H.; Baharuddin H.E.A.; Rosman M.R.; Ismail W.N.W.
title A Comparative Study on Risk Allocation for Different Procurement Type in Malaysian Industry
title_short A Comparative Study on Risk Allocation for Different Procurement Type in Malaysian Industry
title_full A Comparative Study on Risk Allocation for Different Procurement Type in Malaysian Industry
title_fullStr A Comparative Study on Risk Allocation for Different Procurement Type in Malaysian Industry
title_full_unstemmed A Comparative Study on Risk Allocation for Different Procurement Type in Malaysian Industry
title_sort A Comparative Study on Risk Allocation for Different Procurement Type in Malaysian Industry
publishDate 2022
container_title IOP Conference Series: Earth and Environmental Science
container_volume 1067
container_issue 1
doi_str_mv 10.1088/1755-1315/1067/1/012066
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142283107&doi=10.1088%2f1755-1315%2f1067%2f1%2f012066&partnerID=40&md5=a49e5b597673ca4a40d26f3fcb856571
description Risk allocation is one of the important aspects in risk management. However, there is a tendency that risks in construction are being allocated to parties that are least able to resist taking on the risk rather than parties that are more capable to manage the risks. There are different types of procurement that led to different approaches in settling risk allocation between contracting parties. This paper aims to identify risk allocation for different procurement types in construction projects focusing on traditional, design-build and public-private partnership procurement. For this research, a quantitative method was used, where 354 sets of questionnaires were distributed to selected construction firms in Klang Valley. Ninety-two (92) sets of questionnaires were returned and analyzed and the respondents were asked to rate the probability of risk occurrence. The result indicated that the top ranked risk factors are 'unstable government', 'delay in project approvals and permits', 'fluctuation of material cost', 'poorly written contract' and 'inadequate specification in contract'. The recommended risk allocation by respondent for each procurement is presented and found that client and contractor in Traditional procurement, the risks are allocate based on its nature of work. In Design-build, risk factors are mainly allocated to contractor. While in PPP, both contracting parties prefer the majority of the risk factors to be shared. The results of this research will assist practitioners in allocating risks to the party that most qualified to analyze, control, and manage these risks. © 2022 Institute of Physics Publishing. All rights reserved.
publisher Institute of Physics
issn 17551307
language English
format Conference paper
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1809677892428234752