Investigating Reasons for the Unsuccessful Extension of Time (EoT) Claim in the Malaysian Construction Industry; Views from the Professionals

Construction claims are often being cited as difficult and complex; hence, the rejection of claims is regarded as common in the construction industry. Such situation will generally lead to various consequences, among which are conflicts and disputes. In this respect, this paper aims to investigate t...

Full description

Bibliographic Details
Published in:IOP Conference Series: Earth and Environmental Science
Main Author: Yusuwan N.M.; Adnan H.; Mahat N.A.A.; Ahmad Z.Z.; Baharuddin H.E.A.
Format: Conference paper
Language:English
Published: Institute of Physics 2022
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142267932&doi=10.1088%2f1755-1315%2f1067%2f1%2f012055&partnerID=40&md5=a62fb7531b66b537ee2bd3fb0844666d
Description
Summary:Construction claims are often being cited as difficult and complex; hence, the rejection of claims is regarded as common in the construction industry. Such situation will generally lead to various consequences, among which are conflicts and disputes. In this respect, this paper aims to investigate the reasons for the rejection of EoT claims in the Malaysian construction industry. Findings were drawn from a consolidation of practitioner's perceptions via questionnaire survey and semi-structured interviews. However, this paper will only present results obtained from the semi-structured interviews which was conducted to complement findings gathered from the questionnaire survey. The results revealed that failure by the contractor to establish the cause-effect relationship, inadequate supporting documents, non-entitlement in principle/non-valid ground/s, late submission, and non-compliance to the conditions of the contract are the top five (5) reasons for the failure of the submitted claim. The findings suggest the important areas that require much attention. Proper record keeping and management are obviously essential as these are the keys that determine the success of any claim. © 2022 Institute of Physics Publishing. All rights reserved.
ISSN:17551307