Barriers in Implementing Life Cycle Costing in Malaysia's Green Construction Projects

Life cycle costing (LCC) is a tool used worldwide to assess the expected economic performance of a building throughout its life cycle. The application of LCC within the construction industry is still lacking, especially in the development of green construction projects despite the many benefits it h...

Full description

Bibliographic Details
Published in:IOP Conference Series: Earth and Environmental Science
Main Author: Maisham M.; Adnan H.; Ismail N.A.A.; AsyikinMahat N.A.; Yussof F.N.M.
Format: Conference paper
Language:English
Published: Institute of Physics 2022
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142250872&doi=10.1088%2f1755-1315%2f1067%2f1%2f012067&partnerID=40&md5=d82cfda24d7b6cd20e2181338377d5a0
id 2-s2.0-85142250872
spelling 2-s2.0-85142250872
Maisham M.; Adnan H.; Ismail N.A.A.; AsyikinMahat N.A.; Yussof F.N.M.
Barriers in Implementing Life Cycle Costing in Malaysia's Green Construction Projects
2022
IOP Conference Series: Earth and Environmental Science
1067
1
10.1088/1755-1315/1067/1/012067
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142250872&doi=10.1088%2f1755-1315%2f1067%2f1%2f012067&partnerID=40&md5=d82cfda24d7b6cd20e2181338377d5a0
Life cycle costing (LCC) is a tool used worldwide to assess the expected economic performance of a building throughout its life cycle. The application of LCC within the construction industry is still lacking, especially in the development of green construction projects despite the many benefits it has been linked to. This paper aims to identify the main barriers in implementing LCC in green construction projects. The research adopted a quantitative method by conducting questionnaires survey distributed through traditional mail and e-mail as well as online platforms to 700 respondents from various backgrounds, namely architects, quantity surveyors, engineers, and other professionals. A total of one hundred and eighty-seven (187) completed and usable questionnaires were collected and analyzed by using frequency descriptive analysis and by mean value using IBM SPSS Statistic 26. The findings indicate that barriers relevant to project clients and the government were the main barriers to LCC implementation in green construction projects. It gives an understanding that both clients and the government play significant roles in promoting the use of LCC. The findings are beneficial to industry practitioners of green developments as a reference to enhance the LCC process and to devise more effective strategies to promote acceptance of LCC in Malaysia's green constructionprojects. © 2022 Institute of Physics Publishing. All rights reserved.
Institute of Physics
17551307
English
Conference paper
All Open Access; Gold Open Access
author Maisham M.; Adnan H.; Ismail N.A.A.; AsyikinMahat N.A.; Yussof F.N.M.
spellingShingle Maisham M.; Adnan H.; Ismail N.A.A.; AsyikinMahat N.A.; Yussof F.N.M.
Barriers in Implementing Life Cycle Costing in Malaysia's Green Construction Projects
author_facet Maisham M.; Adnan H.; Ismail N.A.A.; AsyikinMahat N.A.; Yussof F.N.M.
author_sort Maisham M.; Adnan H.; Ismail N.A.A.; AsyikinMahat N.A.; Yussof F.N.M.
title Barriers in Implementing Life Cycle Costing in Malaysia's Green Construction Projects
title_short Barriers in Implementing Life Cycle Costing in Malaysia's Green Construction Projects
title_full Barriers in Implementing Life Cycle Costing in Malaysia's Green Construction Projects
title_fullStr Barriers in Implementing Life Cycle Costing in Malaysia's Green Construction Projects
title_full_unstemmed Barriers in Implementing Life Cycle Costing in Malaysia's Green Construction Projects
title_sort Barriers in Implementing Life Cycle Costing in Malaysia's Green Construction Projects
publishDate 2022
container_title IOP Conference Series: Earth and Environmental Science
container_volume 1067
container_issue 1
doi_str_mv 10.1088/1755-1315/1067/1/012067
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142250872&doi=10.1088%2f1755-1315%2f1067%2f1%2f012067&partnerID=40&md5=d82cfda24d7b6cd20e2181338377d5a0
description Life cycle costing (LCC) is a tool used worldwide to assess the expected economic performance of a building throughout its life cycle. The application of LCC within the construction industry is still lacking, especially in the development of green construction projects despite the many benefits it has been linked to. This paper aims to identify the main barriers in implementing LCC in green construction projects. The research adopted a quantitative method by conducting questionnaires survey distributed through traditional mail and e-mail as well as online platforms to 700 respondents from various backgrounds, namely architects, quantity surveyors, engineers, and other professionals. A total of one hundred and eighty-seven (187) completed and usable questionnaires were collected and analyzed by using frequency descriptive analysis and by mean value using IBM SPSS Statistic 26. The findings indicate that barriers relevant to project clients and the government were the main barriers to LCC implementation in green construction projects. It gives an understanding that both clients and the government play significant roles in promoting the use of LCC. The findings are beneficial to industry practitioners of green developments as a reference to enhance the LCC process and to devise more effective strategies to promote acceptance of LCC in Malaysia's green constructionprojects. © 2022 Institute of Physics Publishing. All rights reserved.
publisher Institute of Physics
issn 17551307
language English
format Conference paper
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1809677892605444096