Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects

Characterised as uncertain, complex, politically-sensitive, and extensive in nature define a mega infrastructure project which counting multiple stakeholders with various interest. Common problems during construction on stakeholder conflict were due to project stakeholders have different interests....

Full description

Bibliographic Details
Published in:IOP Conference Series: Earth and Environmental Science
Main Author: Baharuddin H.E.A.; Ismail N.A.A.; Adnan H.; Ismail W.N.W.; Piri I.
Format: Conference paper
Language:English
Published: Institute of Physics 2022
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142246617&doi=10.1088%2f1755-1315%2f1067%2f1%2f012072&partnerID=40&md5=86201d33662481c16f163f52aec269d9
id 2-s2.0-85142246617
spelling 2-s2.0-85142246617
Baharuddin H.E.A.; Ismail N.A.A.; Adnan H.; Ismail W.N.W.; Piri I.
Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
2022
IOP Conference Series: Earth and Environmental Science
1067
1
10.1088/1755-1315/1067/1/012072
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142246617&doi=10.1088%2f1755-1315%2f1067%2f1%2f012072&partnerID=40&md5=86201d33662481c16f163f52aec269d9
Characterised as uncertain, complex, politically-sensitive, and extensive in nature define a mega infrastructure project which counting multiple stakeholders with various interest. Common problems during construction on stakeholder conflict were due to project stakeholders have different interests. Such problems are reworks, disagreements, cost overruns, lack of communication. As the project getting complex and massive, the importance of stakeholder engagement element in project management process is undeniable. The stakeholders in infrastructure project must be efficiently engaged and need earlier involvement during the preconstruction phase either direct or indirectly. This paper aims to recommend improvement to the initial process in stakeholder engagement in infrastructure which involved the internal preparation of engaging the stakeholder before later stage of consultation take place. Two case studies across New Zealand and Malaysia applies through a comparative qualitative analysis and observations. This research obtained information from project documentation and interviews. Such documents are engagement reports, public engagement report and project documentation. The result from the comparative analysis shows the attributes obtained from two case studies during the initial early preparation process of large/mega infrastructure projects. Lesson learnt derived from these two case studies will adding on the improvement to the stakeholder engagement process for an infrastructure project. The findings provide insight into how the factors of engaging stakeholders and public early and closely, improve transparency of information, and understanding of the design concept would help in improving international early preparation of stakeholder in both projects. The paper provides a point of reference for project owner and project team to assist them in emerging best practices of stakeholder engagement in major infrastructure construction projects. © 2022 Institute of Physics Publishing. All rights reserved.
Institute of Physics
17551307
English
Conference paper
All Open Access; Gold Open Access
author Baharuddin H.E.A.; Ismail N.A.A.; Adnan H.; Ismail W.N.W.; Piri I.
spellingShingle Baharuddin H.E.A.; Ismail N.A.A.; Adnan H.; Ismail W.N.W.; Piri I.
Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
author_facet Baharuddin H.E.A.; Ismail N.A.A.; Adnan H.; Ismail W.N.W.; Piri I.
author_sort Baharuddin H.E.A.; Ismail N.A.A.; Adnan H.; Ismail W.N.W.; Piri I.
title Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
title_short Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
title_full Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
title_fullStr Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
title_full_unstemmed Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
title_sort Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
publishDate 2022
container_title IOP Conference Series: Earth and Environmental Science
container_volume 1067
container_issue 1
doi_str_mv 10.1088/1755-1315/1067/1/012072
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142246617&doi=10.1088%2f1755-1315%2f1067%2f1%2f012072&partnerID=40&md5=86201d33662481c16f163f52aec269d9
description Characterised as uncertain, complex, politically-sensitive, and extensive in nature define a mega infrastructure project which counting multiple stakeholders with various interest. Common problems during construction on stakeholder conflict were due to project stakeholders have different interests. Such problems are reworks, disagreements, cost overruns, lack of communication. As the project getting complex and massive, the importance of stakeholder engagement element in project management process is undeniable. The stakeholders in infrastructure project must be efficiently engaged and need earlier involvement during the preconstruction phase either direct or indirectly. This paper aims to recommend improvement to the initial process in stakeholder engagement in infrastructure which involved the internal preparation of engaging the stakeholder before later stage of consultation take place. Two case studies across New Zealand and Malaysia applies through a comparative qualitative analysis and observations. This research obtained information from project documentation and interviews. Such documents are engagement reports, public engagement report and project documentation. The result from the comparative analysis shows the attributes obtained from two case studies during the initial early preparation process of large/mega infrastructure projects. Lesson learnt derived from these two case studies will adding on the improvement to the stakeholder engagement process for an infrastructure project. The findings provide insight into how the factors of engaging stakeholders and public early and closely, improve transparency of information, and understanding of the design concept would help in improving international early preparation of stakeholder in both projects. The paper provides a point of reference for project owner and project team to assist them in emerging best practices of stakeholder engagement in major infrastructure construction projects. © 2022 Institute of Physics Publishing. All rights reserved.
publisher Institute of Physics
issn 17551307
language English
format Conference paper
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1809677892371611648