Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry

The construction industry is one of the most important industries for social and economic growth, as well as a source of wealth. Unfortunately, the construction industry has considerable costs, time, and quality issues, necessitating being resolved. This problem also happened in the Malaysian constr...

Full description

Bibliographic Details
Published in:IOP Conference Series: Earth and Environmental Science
Main Author: Marhani M.A.; Jaapar A.; Bari N.A.; MohamedShaari S.
Format: Conference paper
Language:English
Published: Institute of Physics 2022
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142216354&doi=10.1088%2f1755-1315%2f1067%2f1%2f012048&partnerID=40&md5=c668e36f7787a506228732b3c441181a
id 2-s2.0-85142216354
spelling 2-s2.0-85142216354
Marhani M.A.; Jaapar A.; Bari N.A.; MohamedShaari S.
Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry
2022
IOP Conference Series: Earth and Environmental Science
1067
1
10.1088/1755-1315/1067/1/012048
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142216354&doi=10.1088%2f1755-1315%2f1067%2f1%2f012048&partnerID=40&md5=c668e36f7787a506228732b3c441181a
The construction industry is one of the most important industries for social and economic growth, as well as a source of wealth. Unfortunately, the construction industry has considerable costs, time, and quality issues, necessitating being resolved. This problem also happened in the Malaysian construction industry, mostly to meet the demands of infrastructure projects. Furthermore, over-processing refers to extra work done during the construction process that increases the likelihood of a project failing. This over-processing is caused by the consultant teams' slow response time when a problem develops, as well as the site's poor management system implementation. Lean construction (LC) is the alternative in resolving this non- physical construction wastes. LC is a constant enhancement to the construction processes in sustaining the organisation's growth and profitability. This research aims to develop an LC tools framework that beneficial to future LC practitioners. This paper seeks to identify the most generated over-processing construction waste and the most LC tools to reduce over-processing construction waste on the site. This research uses a quantitative method approach, and the questionnaire survey has been sent to310 G7 contractors registered with the Construction Industry Development Board Malaysia (CIDB) in Malaysia. A total of 116 questionnaires were returned, with a response rate of 37.4%. The findings revealed that the long approval process was the source of the majority of the site's over-processing construction waste. Hence, management contracts, standard forms, total quality management, concurrent engineering and teamwork were the five most implemented LC tools by the LCpractitioners in reducing over-processing waste. It is hoped that the outcomes of this research, able to help the LC practitioners deliver their projects. Thus, it would develop the future's construction productivity towards a better quality of life. © 2022 Institute of Physics Publishing. All rights reserved.
Institute of Physics
17551307
English
Conference paper
All Open Access; Gold Open Access
author Marhani M.A.; Jaapar A.; Bari N.A.; MohamedShaari S.
spellingShingle Marhani M.A.; Jaapar A.; Bari N.A.; MohamedShaari S.
Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry
author_facet Marhani M.A.; Jaapar A.; Bari N.A.; MohamedShaari S.
author_sort Marhani M.A.; Jaapar A.; Bari N.A.; MohamedShaari S.
title Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry
title_short Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry
title_full Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry
title_fullStr Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry
title_full_unstemmed Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry
title_sort Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry
publishDate 2022
container_title IOP Conference Series: Earth and Environmental Science
container_volume 1067
container_issue 1
doi_str_mv 10.1088/1755-1315/1067/1/012048
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85142216354&doi=10.1088%2f1755-1315%2f1067%2f1%2f012048&partnerID=40&md5=c668e36f7787a506228732b3c441181a
description The construction industry is one of the most important industries for social and economic growth, as well as a source of wealth. Unfortunately, the construction industry has considerable costs, time, and quality issues, necessitating being resolved. This problem also happened in the Malaysian construction industry, mostly to meet the demands of infrastructure projects. Furthermore, over-processing refers to extra work done during the construction process that increases the likelihood of a project failing. This over-processing is caused by the consultant teams' slow response time when a problem develops, as well as the site's poor management system implementation. Lean construction (LC) is the alternative in resolving this non- physical construction wastes. LC is a constant enhancement to the construction processes in sustaining the organisation's growth and profitability. This research aims to develop an LC tools framework that beneficial to future LC practitioners. This paper seeks to identify the most generated over-processing construction waste and the most LC tools to reduce over-processing construction waste on the site. This research uses a quantitative method approach, and the questionnaire survey has been sent to310 G7 contractors registered with the Construction Industry Development Board Malaysia (CIDB) in Malaysia. A total of 116 questionnaires were returned, with a response rate of 37.4%. The findings revealed that the long approval process was the source of the majority of the site's over-processing construction waste. Hence, management contracts, standard forms, total quality management, concurrent engineering and teamwork were the five most implemented LC tools by the LCpractitioners in reducing over-processing waste. It is hoped that the outcomes of this research, able to help the LC practitioners deliver their projects. Thus, it would develop the future's construction productivity towards a better quality of life. © 2022 Institute of Physics Publishing. All rights reserved.
publisher Institute of Physics
issn 17551307
language English
format Conference paper
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1809677892547772416