MINIMISING DELAY CONSTRUCTION WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY BY USING LEAN CONSTRUCTION TOOLS

A common underlying cause of construction project hurdles, particularly in developing countries, is avoidable project performance delays. Malaysia is no exception, with nearly 80% of traditionally procured projects experiencing time overruns. Delays can contribute to increased construction costs, lo...

Full description

Bibliographic Details
Published in:Malaysian Construction Research Journal
Main Author: Marhani M.A.; Jaapar A.; Bari N.A.; Shaari S.M.
Format: Article
Language:English
Published: Construction Research Institute of Malaysia 2021
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85129776238&partnerID=40&md5=52c5b76245614b5608dad799c585e8d7
id 2-s2.0-85129776238
spelling 2-s2.0-85129776238
Marhani M.A.; Jaapar A.; Bari N.A.; Shaari S.M.
MINIMISING DELAY CONSTRUCTION WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY BY USING LEAN CONSTRUCTION TOOLS
2021
Malaysian Construction Research Journal
35
3

https://www.scopus.com/inward/record.uri?eid=2-s2.0-85129776238&partnerID=40&md5=52c5b76245614b5608dad799c585e8d7
A common underlying cause of construction project hurdles, particularly in developing countries, is avoidable project performance delays. Malaysia is no exception, with nearly 80% of traditionally procured projects experiencing time overruns. Delays can contribute to increased construction costs, lost revenue due to inefficient production, and termination of contract. The Malaysian construction project's planning and cost behaviour outlined that construction projects' total cost behaviour is unsatisfactory, necessitating extreme caution. Lean construction (LC) is suggested as a solution to the problem of construction waste. LC is a construction project continuous quality improvement process that assists a construction company in maintaining profitable growth. This primary research aims to develop an LC tools framework that can enhance the contractor’s time performance by minimising construction wastes at the site. The purpose of this paper is to identify the implementation of LC tools in reducing construction waste and determining the most critical LC tools in improving time performance in the Malaysian construction industry. To achieve the objectives of this paper, a quantitative method approach was used, and a questionnaire survey was distributed to 310 contractors in Malaysia. The CIDB directory was being used to recognise the contractors registered with the Construction Industry Development Board Malaysia (CIDB) in the G7 categories. Within eight months, 116 questionnaires were returned, with a response rate of 37.4%. The findings revealed that most LC tools implemented to reduce the delay construction waste were teamwork, concurrent engineering, and management contracts. The results also showed that the top two most critical LC tools that impacted time performance in the Malaysian construction industry were total quality management and teamwork if a construction project faces a delay construction waste. It is hoped that having the LC tools framework will improve time performance and reduce construction project delays. As a result, it can increase future construction productivity and transition from its traditional construction method to a greener and more sustainable approach. © 2021, Construction Research Institute of Malaysia. All rights reserved.
Construction Research Institute of Malaysia
19853807
English
Article

author Marhani M.A.; Jaapar A.; Bari N.A.; Shaari S.M.
spellingShingle Marhani M.A.; Jaapar A.; Bari N.A.; Shaari S.M.
MINIMISING DELAY CONSTRUCTION WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY BY USING LEAN CONSTRUCTION TOOLS
author_facet Marhani M.A.; Jaapar A.; Bari N.A.; Shaari S.M.
author_sort Marhani M.A.; Jaapar A.; Bari N.A.; Shaari S.M.
title MINIMISING DELAY CONSTRUCTION WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY BY USING LEAN CONSTRUCTION TOOLS
title_short MINIMISING DELAY CONSTRUCTION WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY BY USING LEAN CONSTRUCTION TOOLS
title_full MINIMISING DELAY CONSTRUCTION WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY BY USING LEAN CONSTRUCTION TOOLS
title_fullStr MINIMISING DELAY CONSTRUCTION WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY BY USING LEAN CONSTRUCTION TOOLS
title_full_unstemmed MINIMISING DELAY CONSTRUCTION WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY BY USING LEAN CONSTRUCTION TOOLS
title_sort MINIMISING DELAY CONSTRUCTION WASTE IN THE MALAYSIAN CONSTRUCTION INDUSTRY BY USING LEAN CONSTRUCTION TOOLS
publishDate 2021
container_title Malaysian Construction Research Journal
container_volume 35
container_issue 3
doi_str_mv
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85129776238&partnerID=40&md5=52c5b76245614b5608dad799c585e8d7
description A common underlying cause of construction project hurdles, particularly in developing countries, is avoidable project performance delays. Malaysia is no exception, with nearly 80% of traditionally procured projects experiencing time overruns. Delays can contribute to increased construction costs, lost revenue due to inefficient production, and termination of contract. The Malaysian construction project's planning and cost behaviour outlined that construction projects' total cost behaviour is unsatisfactory, necessitating extreme caution. Lean construction (LC) is suggested as a solution to the problem of construction waste. LC is a construction project continuous quality improvement process that assists a construction company in maintaining profitable growth. This primary research aims to develop an LC tools framework that can enhance the contractor’s time performance by minimising construction wastes at the site. The purpose of this paper is to identify the implementation of LC tools in reducing construction waste and determining the most critical LC tools in improving time performance in the Malaysian construction industry. To achieve the objectives of this paper, a quantitative method approach was used, and a questionnaire survey was distributed to 310 contractors in Malaysia. The CIDB directory was being used to recognise the contractors registered with the Construction Industry Development Board Malaysia (CIDB) in the G7 categories. Within eight months, 116 questionnaires were returned, with a response rate of 37.4%. The findings revealed that most LC tools implemented to reduce the delay construction waste were teamwork, concurrent engineering, and management contracts. The results also showed that the top two most critical LC tools that impacted time performance in the Malaysian construction industry were total quality management and teamwork if a construction project faces a delay construction waste. It is hoped that having the LC tools framework will improve time performance and reduce construction project delays. As a result, it can increase future construction productivity and transition from its traditional construction method to a greener and more sustainable approach. © 2021, Construction Research Institute of Malaysia. All rights reserved.
publisher Construction Research Institute of Malaysia
issn 19853807
language English
format Article
accesstype
record_format scopus
collection Scopus
_version_ 1809677783605968896