Identification of Factors Influencing Time and Cost Risks in Highway Construction Projects
The construction of highway projects involves many types of risks throughout the various stages of its project life cycle. Those risks are especially significant due to their impact on the project performance and objectives, mainly in terms of costs and time. Several factors of projects risk had bee...
Published in: | International Journal of Sustainable Construction Engineering and Technology |
---|---|
Main Author: | Bakri A.S.; Razak M.A.A.; Shukor A.S.A. |
Format: | Article |
Language: | English |
Published: |
Penerbit UTHM
2021
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85127450110&doi=10.30880%2fijscet.2021.12.03.027&partnerID=40&md5=b5978f266d763011851dc889b425b54d |
Similar Items
-
Identification of the Challenges of Life Cycle Costing in GreenConstruction Projects in Malaysia
by: Maisham M.; Adnan H.; Ismail N.A.A.
Published: (2021) -
Assessing Site Waste Management Practices and Cost Between Conventional and Industrialised Building System (IBS) Projects in Malaysia
by: Shukor A.S.A.; Idris N.H.; Bakri A.S.
Published: (2021) -
ESTABLISHING RELATIONSHIP OF LIFE CYCLE COSTING COMPONENTS TO THE GREEN HIGHWAY PROJECTS IN MALAYSIA
by: Rahman M.F.A.; Zakaria R.; Shamsuddin S.M.
Published: (2023) -
Pre-construction Complexity Factors Affecting Cost Performance of Infrastructure Projects
by: Che Nen A.N.; Mat Isa C.M.; Che Ibrahim C.K.I.; Mohmad Shariff M.S.
Published: (2024) -
Performance indicators for public evaluation of environmental management plan implementation in highway construction projects
by: Dahalan N.H.; Rahman R.A.; Hassan S.H.; Ahmad S.W.
Published: (2024)