Factors Affecting Quality in Construction Project Life Cycle (CPLC)
Quality is among the critical element in managing a construction project. Unfortunately, according to several established documents, issues related to quality in the Malaysian construction project are still rampant. Therefore, to delve deeper into the predicament, understanding the factors affecting...
Published in: | International Journal of Integrated Engineering |
---|---|
Main Author: | |
Format: | Article |
Language: | English |
Published: |
Penerbit UTHM
2022
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85126771377&doi=10.30880%2fijie.2022.14.01.030&partnerID=40&md5=54f6246186fa44b29f12981436b13c6c |
id |
2-s2.0-85126771377 |
---|---|
spelling |
2-s2.0-85126771377 Yaman S.K.; Hassan P.; Yusop N.M.; Hashim N.E.; Mohammad H.; Bakar H.A. Factors Affecting Quality in Construction Project Life Cycle (CPLC) 2022 International Journal of Integrated Engineering 14 1 10.30880/ijie.2022.14.01.030 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85126771377&doi=10.30880%2fijie.2022.14.01.030&partnerID=40&md5=54f6246186fa44b29f12981436b13c6c Quality is among the critical element in managing a construction project. Unfortunately, according to several established documents, issues related to quality in the Malaysian construction project are still rampant. Therefore, to delve deeper into the predicament, understanding the factors affecting construction quality was deemed essential. This even more vital given the minimal number of manuscripts looking into the matter accordingly with the generic construction project life cycle (CPLC). Thus, to operationalise the initial research, a mixed methodology endeavour was selected. This by carrying out a Multi-layered Thematic Analysis (MLTA) to determine factors affecting the quality in the CPLC and questionnaire survey to validate each factor's agreement. Through the MLTA, the results show several similarities in factors, especially in the off-site phases. Whereby in the on-site phases, factors related to 4 M's (money, material, manpower, and machinery) were found to be common. Then, through the questionnaire survey, each factor's mean and median values indicate that the majority of respondents were agreed (scale of 4 to 5) with the dedicated phase of each factor. To sum up, there is evidence that different CPLC has different factors affecting construction quality. In the current form, the findings are valuable as a basis for subsequent research undertaking, e.g. focusing on the micro perspective of quality within each phase and parties involved in the construction project. © 2022 Universiti Tun Hussein Onn Malaysia Publisher's Office. All Rights Reserved. Penerbit UTHM 2229838X English Article All Open Access; Hybrid Gold Open Access |
author |
Yaman S.K.; Hassan P.; Yusop N.M.; Hashim N.E.; Mohammad H.; Bakar H.A. |
spellingShingle |
Yaman S.K.; Hassan P.; Yusop N.M.; Hashim N.E.; Mohammad H.; Bakar H.A. Factors Affecting Quality in Construction Project Life Cycle (CPLC) |
author_facet |
Yaman S.K.; Hassan P.; Yusop N.M.; Hashim N.E.; Mohammad H.; Bakar H.A. |
author_sort |
Yaman S.K.; Hassan P.; Yusop N.M.; Hashim N.E.; Mohammad H.; Bakar H.A. |
title |
Factors Affecting Quality in Construction Project Life Cycle (CPLC) |
title_short |
Factors Affecting Quality in Construction Project Life Cycle (CPLC) |
title_full |
Factors Affecting Quality in Construction Project Life Cycle (CPLC) |
title_fullStr |
Factors Affecting Quality in Construction Project Life Cycle (CPLC) |
title_full_unstemmed |
Factors Affecting Quality in Construction Project Life Cycle (CPLC) |
title_sort |
Factors Affecting Quality in Construction Project Life Cycle (CPLC) |
publishDate |
2022 |
container_title |
International Journal of Integrated Engineering |
container_volume |
14 |
container_issue |
1 |
doi_str_mv |
10.30880/ijie.2022.14.01.030 |
url |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85126771377&doi=10.30880%2fijie.2022.14.01.030&partnerID=40&md5=54f6246186fa44b29f12981436b13c6c |
description |
Quality is among the critical element in managing a construction project. Unfortunately, according to several established documents, issues related to quality in the Malaysian construction project are still rampant. Therefore, to delve deeper into the predicament, understanding the factors affecting construction quality was deemed essential. This even more vital given the minimal number of manuscripts looking into the matter accordingly with the generic construction project life cycle (CPLC). Thus, to operationalise the initial research, a mixed methodology endeavour was selected. This by carrying out a Multi-layered Thematic Analysis (MLTA) to determine factors affecting the quality in the CPLC and questionnaire survey to validate each factor's agreement. Through the MLTA, the results show several similarities in factors, especially in the off-site phases. Whereby in the on-site phases, factors related to 4 M's (money, material, manpower, and machinery) were found to be common. Then, through the questionnaire survey, each factor's mean and median values indicate that the majority of respondents were agreed (scale of 4 to 5) with the dedicated phase of each factor. To sum up, there is evidence that different CPLC has different factors affecting construction quality. In the current form, the findings are valuable as a basis for subsequent research undertaking, e.g. focusing on the micro perspective of quality within each phase and parties involved in the construction project. © 2022 Universiti Tun Hussein Onn Malaysia Publisher's Office. All Rights Reserved. |
publisher |
Penerbit UTHM |
issn |
2229838X |
language |
English |
format |
Article |
accesstype |
All Open Access; Hybrid Gold Open Access |
record_format |
scopus |
collection |
Scopus |
_version_ |
1814778505202761728 |