Simulating the Cycle Time Based on a Manpower Performance Through a System Dynamics Model: A Case Company in the Automotive Sector
The uncertainty of cycle time due to manpower performance could affect the efficiency of completion time at a production line. Ultimately, the challenges of manpower performance contribute to tardiness, which is the delay of a job’s due date from its completion time. Hence, the cycle time of a speci...
Published in: | Lecture Notes in Mechanical Engineering |
---|---|
Main Author: | |
Format: | Conference paper |
Language: | English |
Published: |
Springer Science and Business Media Deutschland GmbH
2022
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85116932987&doi=10.1007%2f978-981-16-4115-2_41&partnerID=40&md5=4ebd70780c25e6c8ff1bca08c0c87f9e |
id |
2-s2.0-85116932987 |
---|---|
spelling |
2-s2.0-85116932987 Ahmarofi A.A.; Zainal Abidin N.; Mahadzir N.H. Simulating the Cycle Time Based on a Manpower Performance Through a System Dynamics Model: A Case Company in the Automotive Sector 2022 Lecture Notes in Mechanical Engineering 10.1007/978-981-16-4115-2_41 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85116932987&doi=10.1007%2f978-981-16-4115-2_41&partnerID=40&md5=4ebd70780c25e6c8ff1bca08c0c87f9e The uncertainty of cycle time due to manpower performance could affect the efficiency of completion time at a production line. Ultimately, the challenges of manpower performance contribute to tardiness, which is the delay of a job’s due date from its completion time. Hence, the cycle time of a specific task must coordinate efficiently to ensure the smoothness of production operation. In this regards, a company facing the issue of uncertain cycle time due to manpower factor in producing an audio system for the automotive sector was considered. This study aims to determine the best-so-far cycle time to produce the audio system at a production based on manpower performance. To mimic a production line, a simulation model was developed based on a system dynamics (SD) approach. Subsequently, what-if analysis is conducted by adjusting the cycle time to observe the effect of schedule pressure and manpower fatigue on productivity. As a result, 5 s is the best cycle time to produce the product at the production of the selected company. Consequently, a policy on setting the cycle time at the production was proposed for the best completion time without tardiness. © 2022, The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd. Springer Science and Business Media Deutschland GmbH 21954356 English Conference paper |
author |
Ahmarofi A.A.; Zainal Abidin N.; Mahadzir N.H. |
spellingShingle |
Ahmarofi A.A.; Zainal Abidin N.; Mahadzir N.H. Simulating the Cycle Time Based on a Manpower Performance Through a System Dynamics Model: A Case Company in the Automotive Sector |
author_facet |
Ahmarofi A.A.; Zainal Abidin N.; Mahadzir N.H. |
author_sort |
Ahmarofi A.A.; Zainal Abidin N.; Mahadzir N.H. |
title |
Simulating the Cycle Time Based on a Manpower Performance Through a System Dynamics Model: A Case Company in the Automotive Sector |
title_short |
Simulating the Cycle Time Based on a Manpower Performance Through a System Dynamics Model: A Case Company in the Automotive Sector |
title_full |
Simulating the Cycle Time Based on a Manpower Performance Through a System Dynamics Model: A Case Company in the Automotive Sector |
title_fullStr |
Simulating the Cycle Time Based on a Manpower Performance Through a System Dynamics Model: A Case Company in the Automotive Sector |
title_full_unstemmed |
Simulating the Cycle Time Based on a Manpower Performance Through a System Dynamics Model: A Case Company in the Automotive Sector |
title_sort |
Simulating the Cycle Time Based on a Manpower Performance Through a System Dynamics Model: A Case Company in the Automotive Sector |
publishDate |
2022 |
container_title |
Lecture Notes in Mechanical Engineering |
container_volume |
|
container_issue |
|
doi_str_mv |
10.1007/978-981-16-4115-2_41 |
url |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85116932987&doi=10.1007%2f978-981-16-4115-2_41&partnerID=40&md5=4ebd70780c25e6c8ff1bca08c0c87f9e |
description |
The uncertainty of cycle time due to manpower performance could affect the efficiency of completion time at a production line. Ultimately, the challenges of manpower performance contribute to tardiness, which is the delay of a job’s due date from its completion time. Hence, the cycle time of a specific task must coordinate efficiently to ensure the smoothness of production operation. In this regards, a company facing the issue of uncertain cycle time due to manpower factor in producing an audio system for the automotive sector was considered. This study aims to determine the best-so-far cycle time to produce the audio system at a production based on manpower performance. To mimic a production line, a simulation model was developed based on a system dynamics (SD) approach. Subsequently, what-if analysis is conducted by adjusting the cycle time to observe the effect of schedule pressure and manpower fatigue on productivity. As a result, 5 s is the best cycle time to produce the product at the production of the selected company. Consequently, a policy on setting the cycle time at the production was proposed for the best completion time without tardiness. © 2022, The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd. |
publisher |
Springer Science and Business Media Deutschland GmbH |
issn |
21954356 |
language |
English |
format |
Conference paper |
accesstype |
|
record_format |
scopus |
collection |
Scopus |
_version_ |
1814778505800450048 |