Analysis the Energy Saving of Chiller Plant (CHIP) Daily Operation by Using Optimal Projected Capacity of Ice Thermal Energy Storage (ITES)

High total cooling load (COLA) relatively during peak and mid-peak as compared to off-peak hour's period requires more operating equipment of chiller plant (CHIP) to be operated during that period. The more operating equipment working, the more energy consumed is required to provide cooling the...

Full description

Bibliographic Details
Published in:Journal of Physics: Conference Series
Main Author: Shaari S.R.; Othman M.L.; Hizam H.; Dahlan N.Y.; Chik M.H.; Yahaya M.S.; Bakar H.A.; Anuar S.Z.; Amir Z.
Format: Conference paper
Language:English
Published: IOP Publishing Ltd 2021
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85109088076&doi=10.1088%2f1742-6596%2f1874%2f1%2f012025&partnerID=40&md5=e8ecbbdd72ef2ec9b2953ab440235204

Similar Items