The framework of factors for the improvement of the significant clauses in the standard form of contract for the ibs construction approach in Malaysia
The Industrialised Building System (IBS) was introduced over 10 years ago in Malaysia, with well-documented benefits and strong support from the government. Apparently, the adoption and implementation of IBS is still low and below the government target. When adopting IBS, construction players mostly...
Published in: | International Journal of Sustainable Construction Engineering and Technology |
---|---|
Main Author: | Mohd Fateh M.A.; Mohammad M.F. |
Format: | Article |
Language: | English |
Published: |
Penerbit UTHM
2021
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85107441182&doi=10.30880%2fijscet.2021.12.01.016&partnerID=40&md5=8f85f485d13a4403340ca61155516923 |
Similar Items
-
A Systematic Review of Existing Standard Form of Contract for Building Information Modeling (BIM) Public Projects in Malaysia
by: Raja Berema R.K.; Ismail Z.; Brahim J.; Nordin N.A.
Published: (2023) -
Risk Mitigation in Industrialized Building System (IBS) Construction
by: Jamalluddin N.A.; Adnan H.; Bakhary N.A.; Rosman M.R.
Published: (2022) -
Juridical Consequences of Anticipatory Breach as a Form of Breach of o Contract
by: Sulistianingsih D.; Wijaya C.C.; Yusoff R.M.; Adhi Y.P.
Published: (2024) -
Temperature rise of cold-formed steel built-up back-to-back column under standard fire
by: Muftah F.; Mohd Sani M.S.H.; Mohammad S.; Poi Ngian S.; Md Tahir M.
Published: (2016) -
Success Factors among Industrialised Building System (IBS) Contractors in Malaysia
by: Adnan H.; Einur Azrin Baharuddin H.; Arzlee Hassan A.; Aisyah Asyikin Mahat N.; Khalidah Kaharuddin S.
Published: (2019)