Safety and risk evaluation implementation at sheet metal stamping company using HIRARC model

Sheet metal stamping has been identified as one of the most hazardous and high-risk process in the world of manufacturing industries. This project was carried out at a sheet metal stamping company located in Perak which is a precision metal stamping company and is focused on 150 tons and 200 tons st...

Full description

Bibliographic Details
Published in:IOP Conference Series: Materials Science and Engineering
Main Author: Othman N.L.A.; Hussain N.S.; Ibrahim D.; Yaacob Y.
Format: Conference paper
Language:English
Published: IOP Publishing Ltd 2019
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85078268325&doi=10.1088%2f1757-899X%2f670%2f1%2f012070&partnerID=40&md5=faf51102950f87d48a882c735f7bdf69
id 2-s2.0-85078268325
spelling 2-s2.0-85078268325
Othman N.L.A.; Hussain N.S.; Ibrahim D.; Yaacob Y.
Safety and risk evaluation implementation at sheet metal stamping company using HIRARC model
2019
IOP Conference Series: Materials Science and Engineering
670
1
10.1088/1757-899X/670/1/012070
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85078268325&doi=10.1088%2f1757-899X%2f670%2f1%2f012070&partnerID=40&md5=faf51102950f87d48a882c735f7bdf69
Sheet metal stamping has been identified as one of the most hazardous and high-risk process in the world of manufacturing industries. This project was carried out at a sheet metal stamping company located in Perak which is a precision metal stamping company and is focused on 150 tons and 200 tons stamping only. A systematic analysis based on Occupational Safety and Health (OSHA) standard was used to create a model of Hazard Identification, Risk Assessment and Control (HIRARC) at the stamping department to determine hazardous process/areas for department operation and maintenance of observation, safety analysis, workplace inspection, safety checklist and high-risk investigation. Initial risk assessment was conducted by classifying the hazards in three types of level, such as High, Medium and Low. The severity of hazards was calculated to estimate the likelihood it will happen and to decide which process/area needs to be applied control measures implemented in the departments. The risk assessments were repeated, and the results were analyzed. From the analysis of risk assessment shows that a reduction of 17% from the high-risk level of 150 tons and 27% at 200 tons. Safety and health are very important to prevent the occurrence of accidents. © Published under licence by IOP Publishing Ltd.
IOP Publishing Ltd
17578981
English
Conference paper
All Open Access; Gold Open Access
author Othman N.L.A.; Hussain N.S.; Ibrahim D.; Yaacob Y.
spellingShingle Othman N.L.A.; Hussain N.S.; Ibrahim D.; Yaacob Y.
Safety and risk evaluation implementation at sheet metal stamping company using HIRARC model
author_facet Othman N.L.A.; Hussain N.S.; Ibrahim D.; Yaacob Y.
author_sort Othman N.L.A.; Hussain N.S.; Ibrahim D.; Yaacob Y.
title Safety and risk evaluation implementation at sheet metal stamping company using HIRARC model
title_short Safety and risk evaluation implementation at sheet metal stamping company using HIRARC model
title_full Safety and risk evaluation implementation at sheet metal stamping company using HIRARC model
title_fullStr Safety and risk evaluation implementation at sheet metal stamping company using HIRARC model
title_full_unstemmed Safety and risk evaluation implementation at sheet metal stamping company using HIRARC model
title_sort Safety and risk evaluation implementation at sheet metal stamping company using HIRARC model
publishDate 2019
container_title IOP Conference Series: Materials Science and Engineering
container_volume 670
container_issue 1
doi_str_mv 10.1088/1757-899X/670/1/012070
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85078268325&doi=10.1088%2f1757-899X%2f670%2f1%2f012070&partnerID=40&md5=faf51102950f87d48a882c735f7bdf69
description Sheet metal stamping has been identified as one of the most hazardous and high-risk process in the world of manufacturing industries. This project was carried out at a sheet metal stamping company located in Perak which is a precision metal stamping company and is focused on 150 tons and 200 tons stamping only. A systematic analysis based on Occupational Safety and Health (OSHA) standard was used to create a model of Hazard Identification, Risk Assessment and Control (HIRARC) at the stamping department to determine hazardous process/areas for department operation and maintenance of observation, safety analysis, workplace inspection, safety checklist and high-risk investigation. Initial risk assessment was conducted by classifying the hazards in three types of level, such as High, Medium and Low. The severity of hazards was calculated to estimate the likelihood it will happen and to decide which process/area needs to be applied control measures implemented in the departments. The risk assessments were repeated, and the results were analyzed. From the analysis of risk assessment shows that a reduction of 17% from the high-risk level of 150 tons and 27% at 200 tons. Safety and health are very important to prevent the occurrence of accidents. © Published under licence by IOP Publishing Ltd.
publisher IOP Publishing Ltd
issn 17578981
language English
format Conference paper
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1809677901609566208