Development of linear regression model for brick waste generation in Malaysian construction industry

Construction waste generation is one of the challenging tasks that related to the materials used at site. Brick waste (BW) is also part of the waste generated in construction sites. This paper determines the brick waste generated in construction stages and conducts linear regression analysis for the...

Full description

Bibliographic Details
Published in:Journal of Physics: Conference Series
Main Author: Hassan S.H.; Aziz H.A.; Zakariah Z.; Noor S.M.; Majid M.R.A.; Karim N.A.
Format: Conference paper
Language:English
Published: Institute of Physics Publishing 2019
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85077800415&doi=10.1088%2f1742-6596%2f1349%2f1%2f012112&partnerID=40&md5=de830a7683fd75e6aa16d8d8d82fc38d
id 2-s2.0-85077800415
spelling 2-s2.0-85077800415
Hassan S.H.; Aziz H.A.; Zakariah Z.; Noor S.M.; Majid M.R.A.; Karim N.A.
Development of linear regression model for brick waste generation in Malaysian construction industry
2019
Journal of Physics: Conference Series
1349
1
10.1088/1742-6596/1349/1/012112
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85077800415&doi=10.1088%2f1742-6596%2f1349%2f1%2f012112&partnerID=40&md5=de830a7683fd75e6aa16d8d8d82fc38d
Construction waste generation is one of the challenging tasks that related to the materials used at site. Brick waste (BW) is also part of the waste generated in construction sites. This paper determines the brick waste generated in construction stages and conducts linear regression analysis for the amount of brick waste generated. The brick waste management practices are also revealed in this study. The method used in this study was Linear Regression Model. The regression model established based on the sample data reported an R2 value of 0.78; therefore, the model can predict approximately 78% of the factor (area) involved in brick waste generation. Specifically, the prediction model is focusing on the relationship between the area of work and the amount of brick waste generated. Moreover, the linear regressions can be applied as tools to predict the brick waste generated at construction sites and as a tool for the contractor to track the brick waste sources in the future. © Published under licence by IOP Publishing Ltd.
Institute of Physics Publishing
17426588
English
Conference paper
All Open Access; Gold Open Access
author Hassan S.H.; Aziz H.A.; Zakariah Z.; Noor S.M.; Majid M.R.A.; Karim N.A.
spellingShingle Hassan S.H.; Aziz H.A.; Zakariah Z.; Noor S.M.; Majid M.R.A.; Karim N.A.
Development of linear regression model for brick waste generation in Malaysian construction industry
author_facet Hassan S.H.; Aziz H.A.; Zakariah Z.; Noor S.M.; Majid M.R.A.; Karim N.A.
author_sort Hassan S.H.; Aziz H.A.; Zakariah Z.; Noor S.M.; Majid M.R.A.; Karim N.A.
title Development of linear regression model for brick waste generation in Malaysian construction industry
title_short Development of linear regression model for brick waste generation in Malaysian construction industry
title_full Development of linear regression model for brick waste generation in Malaysian construction industry
title_fullStr Development of linear regression model for brick waste generation in Malaysian construction industry
title_full_unstemmed Development of linear regression model for brick waste generation in Malaysian construction industry
title_sort Development of linear regression model for brick waste generation in Malaysian construction industry
publishDate 2019
container_title Journal of Physics: Conference Series
container_volume 1349
container_issue 1
doi_str_mv 10.1088/1742-6596/1349/1/012112
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85077800415&doi=10.1088%2f1742-6596%2f1349%2f1%2f012112&partnerID=40&md5=de830a7683fd75e6aa16d8d8d82fc38d
description Construction waste generation is one of the challenging tasks that related to the materials used at site. Brick waste (BW) is also part of the waste generated in construction sites. This paper determines the brick waste generated in construction stages and conducts linear regression analysis for the amount of brick waste generated. The brick waste management practices are also revealed in this study. The method used in this study was Linear Regression Model. The regression model established based on the sample data reported an R2 value of 0.78; therefore, the model can predict approximately 78% of the factor (area) involved in brick waste generation. Specifically, the prediction model is focusing on the relationship between the area of work and the amount of brick waste generated. Moreover, the linear regressions can be applied as tools to predict the brick waste generated at construction sites and as a tool for the contractor to track the brick waste sources in the future. © Published under licence by IOP Publishing Ltd.
publisher Institute of Physics Publishing
issn 17426588
language English
format Conference paper
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1809677900730859520