Optimising concrete enhancement of local ready-mix concrete partially replaced with local fly-Ash

Concrete performance and workability can be improved by using an optimum amount of fly-ash. This leads to the purpose of analysing the percentage of fly-ash that can replace a certain amount of Portland cement in the concrete until it reaches the maximum strength. The experiment was conducted using...

Full description

Bibliographic Details
Published in:Journal of Physics: Conference Series
Main Author: Matarul J.; Mannan M.A.; Yussop N.; Endut M.Z.; Ibrahim A.
Format: Conference paper
Language:English
Published: Institute of Physics Publishing 2019
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85077788339&doi=10.1088%2f1742-6596%2f1349%2f1%2f012029&partnerID=40&md5=0f05fb54dba9a82f6a4ae641ae0313fe
Description
Summary:Concrete performance and workability can be improved by using an optimum amount of fly-ash. This leads to the purpose of analysing the percentage of fly-ash that can replace a certain amount of Portland cement in the concrete until it reaches the maximum strength. The experiment was conducted using G25 and G45 concrete supplied by a local ready-mix concrete plant in Kuching, Sarawak. The cement content of each concrete grade was replaced with various fly-ash percentages of 20, 30, 40, 50 and 60 collected from waste materials in Pending Sarawak. The specimens used in the studies were made of 150mm concrete cubes. Specimens were tested for compressive strength at the ages of 3, 7, 14, 28, 56 and 90 days. The curing age extended to 56th and 90th-day to participated slow pozzolonic reaction process contributed by fly-ash. Based on the test results for both concrete grades with enhancements, the compressive strength significantly increases from 7 days to 56 days, and then slightly increases on the 90th-day. The G25 concrete has an optimum strength with a fly-ash replacement of 30% cement content, followed by 40%, 20% and 50%. Similarly, the G45 concrete achieved an optimum strength with a fly-ash replacement about 30% cement content, followed by 20%, 40% and 50%. In addition, both grades of concrete tested have a cut-off cement replacement level of 60%, beyond which the compressive strength falls below that of the control mixtures. © Published under licence by IOP Publishing Ltd.
ISSN:17426588
DOI:10.1088/1742-6596/1349/1/012029