Production Rate Improvement for Assembly Line in Sheet Metal Stamping Industry
In today's manufacturing industry, there is an increased focus to produce the right product at right time. This project is to study the process flow of Philips Fluorescents Lamp assembly line in sheet metal stamping company based on lines concept and factors influencing the production lines eff...
Published in: | IOP Conference Series: Materials Science and Engineering |
---|---|
Main Author: | |
Format: | Conference paper |
Language: | English |
Published: |
Institute of Physics Publishing
2019
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85069043529&doi=10.1088%2f1757-899X%2f505%2f1%2f012119&partnerID=40&md5=840aa907838d71bfe8b46db05845953b |
id |
2-s2.0-85069043529 |
---|---|
spelling |
2-s2.0-85069043529 Othman N.L.A.; Zain N.A.M.; Ibrahim D.; Yaacob Y. Production Rate Improvement for Assembly Line in Sheet Metal Stamping Industry 2019 IOP Conference Series: Materials Science and Engineering 505 1 10.1088/1757-899X/505/1/012119 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85069043529&doi=10.1088%2f1757-899X%2f505%2f1%2f012119&partnerID=40&md5=840aa907838d71bfe8b46db05845953b In today's manufacturing industry, there is an increased focus to produce the right product at right time. This project is to study the process flow of Philips Fluorescents Lamp assembly line in sheet metal stamping company based on lines concept and factors influencing the production lines efficiency by analyzing the problem occurred in the process. The manual and automatic assembly has been analyzed for its influence on the assembly line. The transformation from manual to the automated assembly where the manual screwing and packing processes replaced by automated machines is studied. During factory visit, the average cycle time for manual and automated assembly process was taken in order to analyze it. The number of output of Fluorescents Lamp before and after the transformation was studied. Data collected used to simulate the current assembly line process using simulation software, DELMIA Quest. The layout where all process consists of manual assembly and after adding the machines have been designed and analyzed using this software. Based on the current layout analysis, a new layout was proposed in order to get a better process flow. The proposed layout shows an improvement of average production rate of at least 16% from the current assembly line. © Published under licence by IOP Publishing Ltd. Institute of Physics Publishing 17578981 English Conference paper All Open Access; Bronze Open Access |
author |
Othman N.L.A.; Zain N.A.M.; Ibrahim D.; Yaacob Y. |
spellingShingle |
Othman N.L.A.; Zain N.A.M.; Ibrahim D.; Yaacob Y. Production Rate Improvement for Assembly Line in Sheet Metal Stamping Industry |
author_facet |
Othman N.L.A.; Zain N.A.M.; Ibrahim D.; Yaacob Y. |
author_sort |
Othman N.L.A.; Zain N.A.M.; Ibrahim D.; Yaacob Y. |
title |
Production Rate Improvement for Assembly Line in Sheet Metal Stamping Industry |
title_short |
Production Rate Improvement for Assembly Line in Sheet Metal Stamping Industry |
title_full |
Production Rate Improvement for Assembly Line in Sheet Metal Stamping Industry |
title_fullStr |
Production Rate Improvement for Assembly Line in Sheet Metal Stamping Industry |
title_full_unstemmed |
Production Rate Improvement for Assembly Line in Sheet Metal Stamping Industry |
title_sort |
Production Rate Improvement for Assembly Line in Sheet Metal Stamping Industry |
publishDate |
2019 |
container_title |
IOP Conference Series: Materials Science and Engineering |
container_volume |
505 |
container_issue |
1 |
doi_str_mv |
10.1088/1757-899X/505/1/012119 |
url |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85069043529&doi=10.1088%2f1757-899X%2f505%2f1%2f012119&partnerID=40&md5=840aa907838d71bfe8b46db05845953b |
description |
In today's manufacturing industry, there is an increased focus to produce the right product at right time. This project is to study the process flow of Philips Fluorescents Lamp assembly line in sheet metal stamping company based on lines concept and factors influencing the production lines efficiency by analyzing the problem occurred in the process. The manual and automatic assembly has been analyzed for its influence on the assembly line. The transformation from manual to the automated assembly where the manual screwing and packing processes replaced by automated machines is studied. During factory visit, the average cycle time for manual and automated assembly process was taken in order to analyze it. The number of output of Fluorescents Lamp before and after the transformation was studied. Data collected used to simulate the current assembly line process using simulation software, DELMIA Quest. The layout where all process consists of manual assembly and after adding the machines have been designed and analyzed using this software. Based on the current layout analysis, a new layout was proposed in order to get a better process flow. The proposed layout shows an improvement of average production rate of at least 16% from the current assembly line. © Published under licence by IOP Publishing Ltd. |
publisher |
Institute of Physics Publishing |
issn |
17578981 |
language |
English |
format |
Conference paper |
accesstype |
All Open Access; Bronze Open Access |
record_format |
scopus |
collection |
Scopus |
_version_ |
1809677599910133760 |