Risk assessment of piling work for mass rapid transit (MRT) construction project
This study focuses on the piling works of Mass Rapid Transit (MRT) line 1 construction project along Sungai Buloh Station to Kajang Station in Malaysia, considering that piling work is one of the high risk construction activities. This study utilizes risk assessment tool using Hazard Identification,...
الحاوية / القاعدة: | Geographia Technica |
---|---|
المؤلف الرئيسي: | Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S. |
التنسيق: | مقال |
اللغة: | English |
منشور في: |
Asociatia Geographia Technica
2019
|
الوصول للمادة أونلاين: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85068451350&doi=10.21163%2fGT_2019.141.37&partnerID=40&md5=63c0efbd6d1679093e62ede5c06bf93f |
مواد مشابهة
-
Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
بواسطة: Ahmad A.C.; Zin I.N.M.; Rosli M.N.; Wahid A.M.A.; Kamar I.F.M.
منشور في: (2016) -
The Influence of Work Adjustment of Malaysian Expatriate Executives in Malaysian Construction Companies Overseas
بواسطة: Zainol H.; Wahid A.M.A.; Ahmad A.C.; Tharim A.H.A.; Ismail N.
منشور في: (2014) -
Survey on public participation of Malaysia's MRT project with reference to Environmental Impact Assessment
بواسطة: Zain F.M.Y.; Omar D.
منشور في: (2018) -
Work Process in Establishment Work Development Plan for Interior Design Project Delivery; The Guttman Approach
بواسطة: Mustapha A.A.; Noorhani N.M.A.
منشور في: (2022) -
Predictive Model for Incident Severity at Railway Construction Site Using Rapid Miner
بواسطة: Ngadiron Z.; Ganasan R.; Ramli M.F.; Mahyeddin M.E.; Luqman M.I.; Jiafu G.; Kamaluddin N.A.
منشور في: (2024)