Multi-objectives optimization model for flexible job shop scheduling problem (FJSSP) with machines' workload balancing
Flexible Job Shop Scheduling Problem (FJSSP) concerns with production scheduling where each operation of any job is allowed to be processed by any machine from a set of machines, rather than one specified machine. FJSSPs are mainly formulated as Mixed Integer Linear Programming (MILP) models with di...
Published in: | AIP Conference Proceedings |
---|---|
Main Author: | Shuib A.; Gran S.S.A. |
Format: | Conference paper |
Language: | English |
Published: |
American Institute of Physics Inc.
2018
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85049809715&doi=10.1063%2f1.5041637&partnerID=40&md5=8567bcf7c752411c6412b24be389d8f7 |
Similar Items
-
Whale Optimization Algorithm (WOA) for Task Scheduling Problem in Multi-Processors Environment
by: Suliman S.I.; Khalish M.N.; Yusof Y.W.M.; Rahman F.Y.A.
Published: (2024) -
Work-life Balance and Job Performance: A case of Royal Malaysian Police
by: Hilwa, et al.
Published: (2024) -
Solving Combined Economic Emission Dispatch Problems Using Multi-objective Hybrid Evolutionary-Barnacles Mating Optimization
by: Ismail N.L.; Musirin I.; Dahlan N.Y.; Mansor M.H.; Senthil Kumar A.V.
Published: (2024) -
Multi-Objectives Optimization of Abrasive Water Jet Machining (AJWM) on Mild Steel
by: Halim N.H.A.; Tharazi I.; Salleh F.M.; Morni M.F.; Khalit M.I.; Abdullah M.A.A.
Published: (2024) -
Workload and subjective well-being among nurses in Malaysia
by: Tahir N.K.M.; Hussein N.; Samad S.
Published: (2017)