Application of Grounded Theory in Determining Required Elements for IPv6 Risk Assessment Equation
The deployment of Internet Protocol version 6 (IPv6) has raised security concerns among the network administrators. Thus, in strengthening the network security, administrator requires an appropriate method to assess the possible risks that occur in their networks. Aware of the needs to calculate ris...
Published in: | MATEC Web of Conferences |
---|---|
Main Author: | Rosli A.; Mat Taib A.; Wan Ali W.N.A.; Hamid R.S. |
Format: | Conference paper |
Language: | English |
Published: |
EDP Sciences
2018
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85042772775&doi=10.1051%2fmatecconf%2f201815006005&partnerID=40&md5=1332ca6630014aea0c08a3efc21b9d2a |
Similar Items
-
A Learning Kit on IPv6 Deployment and its Security Challenges for Neophytes
by: Taib A.M.; Othman N.A.; Hamid R.S.; Halim I.H.A.
Published: (2019) -
IPv6 deployment: Security risk assessment using i-SeRP system in enterprise network
by: Rosli A.; Ali W.N.A.W.; Taib A.H.M.
Published: (2012) -
CONSOLIDATION INTEGRATED BUOYANCY EQUATION FOR SOFT GROUND IMPROVED WITH LIGHTWEIGHT POLYURETHANE FOAM
by: Lat D.C.; Jais I.B.M.; Ali N.; Yunus N.Z.M.; Norzarin N.H.W.; Zainuddin A.N.
Published: (2022) -
Risk and resilience among mothers and fathers of primary school age children with ASD in Malaysia: A qualitative constructive grounded theory approach
by: Ilias K.; Cornish K.; Park M.S.; Toran H.; Golden K.J.
Published: (2019) -
FLOOD RISK MANAGEMENT IN XAY DISTRICT, LAO PEOPLE’S DEMOCRATIC REPUBLIC REQUIRES STRENGTHENING
by: Manhmanyvong S.; Thadaniti S.; Yaman R.; Sulaiman M.A.
Published: (2021)