Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
The North-South Expressway (NSE) (Lebuhraya Utara-Selatan) is the longest expressway in Malaysia with the total length of about 772 km (482 miles) running from Bukit Kayu Hitam in to Johor Bahru. It is known named after the highway's concessionaire, Projek Lebuhraya Utara Selatan Berhad (North...
Published in: | MATEC Web of Conferences |
---|---|
Main Author: | Ahmad A.C.; Zin I.N.M.; Rosli M.N.; Wahid A.M.A.; Kamar I.F.M. |
Format: | Conference paper |
Language: | English |
Published: |
EDP Sciences
2016
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84983517090&doi=10.1051%2fmatecconf%2f20166600106&partnerID=40&md5=7fba13c1715f9c18d3131e2667e57fde |
Similar Items
-
Risk assessment of piling work for mass rapid transit (MRT) construction project
by: Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S.
Published: (2019) -
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Accidents at Power Plant
by: Ahmad A.C.; Zin I.N.M.; Othman M.K.; Muhamad N.H.
Published: (2016) -
Stormwater as a criterion for green highway
by: Ahmad A.C.; Husin N.I.; Wahid A.M.A.; Kamaruzzaman S.N.
Published: (2017) -
Sustainable Waste Management for Green Highway Initiatives
by: Husin N.I.; Ahmad A.C.; Wahid A.M.A.; Kamaruzzaman S.N.
Published: (2016) -
A Systematic Review on Hazard Identification, Risk Assessment and Risk Control in Academic Laboratory
by: Wahab N.A.A.; Aqila N.A.; Isa N.; Husin N.I.; Zin A.M.; Mokhtar M.; Mukhtar N.M.A.
Published: (2021)