Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways

The North-South Expressway (NSE) (Lebuhraya Utara-Selatan) is the longest expressway in Malaysia with the total length of about 772 km (482 miles) running from Bukit Kayu Hitam in to Johor Bahru. It is known named after the highway's concessionaire, Projek Lebuhraya Utara Selatan Berhad (North...

Full description

Bibliographic Details
Published in:MATEC Web of Conferences
Main Author: Ahmad A.C.; Zin I.N.M.; Rosli M.N.; Wahid A.M.A.; Kamar I.F.M.
Format: Conference paper
Language:English
Published: EDP Sciences 2016
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84983517090&doi=10.1051%2fmatecconf%2f20166600106&partnerID=40&md5=7fba13c1715f9c18d3131e2667e57fde
id 2-s2.0-84983517090
spelling 2-s2.0-84983517090
Ahmad A.C.; Zin I.N.M.; Rosli M.N.; Wahid A.M.A.; Kamar I.F.M.
Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
2016
MATEC Web of Conferences
66

10.1051/matecconf/20166600106
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84983517090&doi=10.1051%2fmatecconf%2f20166600106&partnerID=40&md5=7fba13c1715f9c18d3131e2667e57fde
The North-South Expressway (NSE) (Lebuhraya Utara-Selatan) is the longest expressway in Malaysia with the total length of about 772 km (482 miles) running from Bukit Kayu Hitam in to Johor Bahru. It is known named after the highway's concessionaire, Projek Lebuhraya Utara Selatan Berhad (North South Expressway Project) abbreviated as PLUS Expressway. A study on the occupational safety among maintenance workers of PLUS Expressway was conducted. The aim for this research is to identify the hazards and determine the risk level of highway maintenance works. This research has identified the hazards occupies during highway maintenance works. Subsequently, the levels of risk for hazards during highway maintenance works are determined. The scope of this study is along the northern PLUS Expressway specified from Southern Ipoh to Bukit Kayu Hitam and focused on the maintenance workers of Projek Penyelenggaraan Lebuhraya Berhad (PROPEL). Eighty (80) sets of questionnaires survey on likelihood and severity of highway maintenance hazards have been distributed to highway maintenance workers. The data were analysed by using Excel to compose weightage average index (WAI) in order to compute the risk level of those hazards. The result concluded that the extreme level of hazard that occurred during maintenance of highway are hazards related to electricity, hazards that engage with scaffolding, hazards while using crane and hazards involve fire and explosion. © 2016 The Authors.
EDP Sciences
2261236X
English
Conference paper
All Open Access; Gold Open Access
author Ahmad A.C.; Zin I.N.M.; Rosli M.N.; Wahid A.M.A.; Kamar I.F.M.
spellingShingle Ahmad A.C.; Zin I.N.M.; Rosli M.N.; Wahid A.M.A.; Kamar I.F.M.
Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
author_facet Ahmad A.C.; Zin I.N.M.; Rosli M.N.; Wahid A.M.A.; Kamar I.F.M.
author_sort Ahmad A.C.; Zin I.N.M.; Rosli M.N.; Wahid A.M.A.; Kamar I.F.M.
title Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
title_short Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
title_full Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
title_fullStr Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
title_full_unstemmed Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
title_sort Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
publishDate 2016
container_title MATEC Web of Conferences
container_volume 66
container_issue
doi_str_mv 10.1051/matecconf/20166600106
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-84983517090&doi=10.1051%2fmatecconf%2f20166600106&partnerID=40&md5=7fba13c1715f9c18d3131e2667e57fde
description The North-South Expressway (NSE) (Lebuhraya Utara-Selatan) is the longest expressway in Malaysia with the total length of about 772 km (482 miles) running from Bukit Kayu Hitam in to Johor Bahru. It is known named after the highway's concessionaire, Projek Lebuhraya Utara Selatan Berhad (North South Expressway Project) abbreviated as PLUS Expressway. A study on the occupational safety among maintenance workers of PLUS Expressway was conducted. The aim for this research is to identify the hazards and determine the risk level of highway maintenance works. This research has identified the hazards occupies during highway maintenance works. Subsequently, the levels of risk for hazards during highway maintenance works are determined. The scope of this study is along the northern PLUS Expressway specified from Southern Ipoh to Bukit Kayu Hitam and focused on the maintenance workers of Projek Penyelenggaraan Lebuhraya Berhad (PROPEL). Eighty (80) sets of questionnaires survey on likelihood and severity of highway maintenance hazards have been distributed to highway maintenance workers. The data were analysed by using Excel to compose weightage average index (WAI) in order to compute the risk level of those hazards. The result concluded that the extreme level of hazard that occurred during maintenance of highway are hazards related to electricity, hazards that engage with scaffolding, hazards while using crane and hazards involve fire and explosion. © 2016 The Authors.
publisher EDP Sciences
issn 2261236X
language English
format Conference paper
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1809677909558820864