Selection criterion of production methods used in the Kanban Pull System at Malaysian auto suppliers

Kanban Pull System is a key concept in Lean Manufacturing where production is done based on customer demand. The system, through designated production methods, commands the preceding process to produce only what is needed by the next process in a timely manner using Kanban as a signal to convey inst...

Full description

Bibliographic Details
Published in:IEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding
Main Author: Rusli M.H.M.; Jaffar A.; Muhamud-Kayat S.; Ali M.T.
Format: Conference paper
Language:English
Published: Institute of Electrical and Electronics Engineers Inc. 2015
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84931028833&doi=10.1109%2fIEOM.2015.7093923&partnerID=40&md5=31174547c187c8a2af9ef61f553a7702
id 2-s2.0-84931028833
spelling 2-s2.0-84931028833
Rusli M.H.M.; Jaffar A.; Muhamud-Kayat S.; Ali M.T.
Selection criterion of production methods used in the Kanban Pull System at Malaysian auto suppliers
2015
IEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding


10.1109/IEOM.2015.7093923
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84931028833&doi=10.1109%2fIEOM.2015.7093923&partnerID=40&md5=31174547c187c8a2af9ef61f553a7702
Kanban Pull System is a key concept in Lean Manufacturing where production is done based on customer demand. The system, through designated production methods, commands the preceding process to produce only what is needed by the next process in a timely manner using Kanban as a signal to convey instructions to synchronize the production. There are three types of production methods in the Kanban Pull System which are the Kanban Sequencing, Lot Formation and Pattern Production. This paper studies the three types of production method in Kanban Pull System through field research done at Malaysian automotive suppliers in order to understand the factors that influence the selection of the production methods. As a result, a comparison between the production methods are done in terms of the Pull system tools used, its pulling mechanism and its JIT level of effectiveness with regards to reduction in lead time, stock and waste. A summary of criterion and image governing the selection of the production methods is derived from the result gained from this study. © 2015 IEEE.
Institute of Electrical and Electronics Engineers Inc.

English
Conference paper

author Rusli M.H.M.; Jaffar A.; Muhamud-Kayat S.; Ali M.T.
spellingShingle Rusli M.H.M.; Jaffar A.; Muhamud-Kayat S.; Ali M.T.
Selection criterion of production methods used in the Kanban Pull System at Malaysian auto suppliers
author_facet Rusli M.H.M.; Jaffar A.; Muhamud-Kayat S.; Ali M.T.
author_sort Rusli M.H.M.; Jaffar A.; Muhamud-Kayat S.; Ali M.T.
title Selection criterion of production methods used in the Kanban Pull System at Malaysian auto suppliers
title_short Selection criterion of production methods used in the Kanban Pull System at Malaysian auto suppliers
title_full Selection criterion of production methods used in the Kanban Pull System at Malaysian auto suppliers
title_fullStr Selection criterion of production methods used in the Kanban Pull System at Malaysian auto suppliers
title_full_unstemmed Selection criterion of production methods used in the Kanban Pull System at Malaysian auto suppliers
title_sort Selection criterion of production methods used in the Kanban Pull System at Malaysian auto suppliers
publishDate 2015
container_title IEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding
container_volume
container_issue
doi_str_mv 10.1109/IEOM.2015.7093923
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-84931028833&doi=10.1109%2fIEOM.2015.7093923&partnerID=40&md5=31174547c187c8a2af9ef61f553a7702
description Kanban Pull System is a key concept in Lean Manufacturing where production is done based on customer demand. The system, through designated production methods, commands the preceding process to produce only what is needed by the next process in a timely manner using Kanban as a signal to convey instructions to synchronize the production. There are three types of production methods in the Kanban Pull System which are the Kanban Sequencing, Lot Formation and Pattern Production. This paper studies the three types of production method in Kanban Pull System through field research done at Malaysian automotive suppliers in order to understand the factors that influence the selection of the production methods. As a result, a comparison between the production methods are done in terms of the Pull system tools used, its pulling mechanism and its JIT level of effectiveness with regards to reduction in lead time, stock and waste. A summary of criterion and image governing the selection of the production methods is derived from the result gained from this study. © 2015 IEEE.
publisher Institute of Electrical and Electronics Engineers Inc.
issn
language English
format Conference paper
accesstype
record_format scopus
collection Scopus
_version_ 1820775477561786368