Implementing graph coloring heuristic in construction phase of curriculum-based course timetabling problem
Curriculum-based course timetabling problem (CB-CTP) is a classical problem that is still being researched on nowadays. There are two phases in solving CB-CTP. The first phase is the construction phase where a population of initial solutions is generated. The second phase is the optimization phase w...
Published in: | IEEE Symposium on Computers and Informatics, ISCI 2013 |
---|---|
Main Author: | Azlan A.; Hussin N.M. |
Format: | Conference paper |
Language: | English |
Published: |
IEEE Computer Society
2013
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84886498828&doi=10.1109%2fISCI.2013.6612369&partnerID=40&md5=c9052e9efaa914d792a5e96a6e3d91e1 |
Similar Items
-
Genetic algorithm with elitist-tournament for clashes-free slots of lecturer timetabling problem
by: Yusoff M.; Othman A.A.
Published: (2018) -
Evaluation of Genetic Algorithm and Hybrid Genetic Algorithm-Hill Climbing with Elitist for Lecturer University Timetabling Problem
by: Yusoff, et al.
Published: (2019) -
Implementation of Complex Engineering Problem Solving (CEP) and Complex Engineering Activities (CEA) in Malaysian Engineering Curriculum: A Pilot Study
by: Azmin N.F.M.; Mat Isa C.M.; Lee W.-K.; Ibrahim S.N.; Lian O.C.
Published: (2023) -
The Problems Faced by Contractors in Implementing the Quality Assessment System in Construction (QLASSIC) in Construction Industry
by: Khalid Z.B.; Saarani P.S.N.B.; Ahamad J.B.
Published: (2024) -
Implementation of industrial training course: Enhancement of processes and procedures
by: Baharom R.; Hamid Z.A.; Yassin I.M.; Wahab N.A.; Hamzah N.; Yussoff Y.M.
Published: (2017)