Multi-criteria selection for TNB transmission line route using AHP and GIS

Tenaga Nasional Berhad (TNB) to provide electricity supply in Peninsular Malaysia and was established in 1990. It involved in the generation, transmission, distribution and electricity in Peninsular Malaysia. This study is aimed at studying and determining the optimum route of transmission line usin...

Full description

Bibliographic Details
Published in:Proceedings of the 2012 International Conference on System Engineering and Technology, ICSET 2012
Main Author: Husain F.; Sulaiman N.A.; Hashim K.A.; Samad A.M.
Format: Conference paper
Language:English
Published: 2012
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84871146918&doi=10.1109%2fICSEngT.2012.6339292&partnerID=40&md5=31d937db9bb74f0ba4efc38962bc4609
Description
Summary:Tenaga Nasional Berhad (TNB) to provide electricity supply in Peninsular Malaysia and was established in 1990. It involved in the generation, transmission, distribution and electricity in Peninsular Malaysia. This study is aimed at studying and determining the optimum route of transmission line using AHP and GIS. Kajang District in Selangor was selected as a study site. Transmission line routing involves a variety of criteria for determine of the suitable route. Alternative routes that balance community input with the most convincing environmental impact, build ability, the use of current and future land, project costs and the needs of a particular electrical system. Four phases of route selection for a transmission line such as Macro Corridor study area, Alternative corridors, Alternative Route, and Preferred Route. © 2012 IEEE.
ISSN:
DOI:10.1109/ICSEngT.2012.6339292