Malaysia crude oil production estimation: An application of ARIMA model
Monthly Malaysia crude oil production data for the period of January 2005 to May 2010 were analyzed using time-series method called Autoregressive Integrated Moving Average (ARIMA) model. Autocorrelation and partial autocorrelation functions were calculated to examine the stationarity of the data. T...
Published in: | CSSR 2010 - 2010 International Conference on Science and Social Research |
---|---|
Main Author: | Yusof N.M.; Rashid R.S.A.; Mohamed Z. |
Format: | Conference paper |
Language: | English |
Published: |
2010
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-79959632376&doi=10.1109%2fCSSR.2010.5773729&partnerID=40&md5=ec80ad9800513549e19f3f8a5102c137 |
Similar Items
-
Comparing Model Building Performance of ARIMA Model and Logarithmic Return Model
by: Lee, et al.
Published: (2024) -
Comparing Model Building Performance of ARIMA Model and Logarithmic Return Model
by: Lee S.L.; Liew C.Y.; Chen C.K.; Voon L.L.
Published: (2024) -
Modelling and forecasting S&P 500 stock prices using hybrid Arima-Garch Model
by: Mustapa F.H.; Ismail M.T.
Published: (2019) -
Development and testing of an oil palm (Elaeis guineensis Jacq.) fruit digester process for kernel free in crude palm oil production
by: Wondi M.H.; Haris N.I.N.; Shamsudin R.; Yunus R.; Mohd Ali M.; Iswardi A.H.
Published: (2024) -
Gold price forecasting using ARIMA-GARCH model during COVID-19 pandemic outbreak
by: Naji A.S.M.; Yaziz S.R.; Zakaria R.; Mohamad N.N.; Radi N.F.A.
Published: (2024)